Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

Top 20 out of 2689.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135  

09/17/2014 CIP 014 Review Role (v: 1)   

CIP014ReviewerRole.pdf   download>
Description: CIP 014 Review Role
Type: Report
Status: DRAFT
Contact

 

09/16/2014 2014 Othello Area Feasibility Study (v: 1)   

...thelloAreaFeasibilityStudy.pdf   download>
Description: 2014 Othello Area Feasibility Study
Type: Report
Status: FINAL
Contact

 

09/15/2014 Planning Meeting Presentation (Paul) (v: 1)   

PlanningMeeting09_16.pdf   download>
Description: Planning Meeting Presentation (Paul)
Type: Presentation
Status: FINAL
Contact

 

09/15/2014 2015 System Assessment Contingency-RAS Files (v: 1)   

...essment_Contingey-RASFiles.pdf   download>
Description: 2015 System Assessment Contingency-RAS Files
Type: Presentation
Status: FINAL
Contact

 

09/15/2014 2014 Sensitivity Update Max Gen During Light Load (v: 1)   

...date_MaxGenDuringLightLoad.pdf   download>
Description: 2014 Sensitivity Update Max Gen During Light Load
Type: Presentation
Status: FINAL
Contact

 

09/15/2014 Planning Meeting Agenda (9.16.14) (v: 1)   

...l_9__Agenda_Draft_v2_clean.pdf   download>
Description: Planning Meeting Agenda (9.16.14)
Type: Agenda
Status: DRAFT
Contact

 

09/12/2014 2025hw1_ReferenceCase_PWB (v: 1)   

request access >  login >
Description: 2025hw1_ReferenceCase_PWB
Type: Base Case
Status: DRAFT
Contact

 

09/12/2014 2025hw1_ReferenceCase_EPC (v: 1)   

request access >  login >
Description: 2025hw1_ReferenceCase_EPC
Type: Base Case
Status: DRAFT
Contact

 

09/12/2014 25HW1_ReferenceCase Case Summary (v: 1)   

request access >  login >
Description: 25HW1_ReferenceCase Case Summary
Type: Base Case
Status: DRAFT
Contact

 

09/11/2014 15HS4OP_Area40_InitialSubmittal_PWB (v: 1)   

request access >  login >
Description: 15HS4OP_Area40_InitialSubmittal_PWB
Type: Base Case
Status: DRAFT
Contact

 

09/11/2014 15HS4OP_Area40_InitialSubmittal_EPC (v: 1)   

request access >  login >
Description: 15HS4OP_Area40_InitialSubmittal_EPC
Type: Base Case
Status: DRAFT
Contact

 

09/11/2014 Master Change File_15HS4-OP_InitialReview (2) (v: 1)   

request access >  login >
Description: Master Change File_15HS4-OP_InitialReview (2)
Type: Base Case
Status: DRAFT
Contact

 

09/11/2014 Economic Planning Study Presentation (9.11.14) (v: 1)   

...StudyPresentation(9.11.14).pdf   download>
Description: Economic Planning Study Presentation (9.11.14)
Type:
Status: FINAL
Contact

 

09/10/2014 PEFA Screening Guidelines 6.4.14 (v: 1)   

...omments060414ver7Clean (1).pdf   download>
Description: PEFA Screening Guidelines 6.4.14
Type: Report
Status: DRAFT
Contact

 

09/10/2014 Post Contingency Voltage Angle Difference (v: 1)   

...ltageAngleDifference_7_30.docx   download>
Description: Post Contingency Voltage Angle Difference
Type: Report
Status: DRAFT
Contact

 

09/08/2014 15LS1OP_DraftPreRun_PWB (v: 1)   

request access >  login >
Description: 15LS1OP_DraftPreRun_PWB
Type: Base Case
Status: DRAFT
Contact

 

09/08/2014 15LS1OP_DraftPreRun_EPC (v: 1)   

request access >  login >
Description: 15LS1OP_DraftPreRun_EPC
Type: Base Case
Status: DRAFT
Contact

 

09/08/2014 Master Change File_15LS1-OP_InitialReview (v: 1)   

request access >  login >
Description: Master Change File_15LS1-OP_InitialReview
Type: Base Case
Status: DRAFT
Contact

 

09/03/2014 17lsp1s_Area40FinalSubmittal_PWB (v: 1)   

request access >  login >
Description: 17lsp1s_Area40FinalSubmittal_PWB
Type: Base Case
Status: DRAFT
Contact

 

09/03/2014 17lsp1s_Area40FinalSubmittal_EPC (v: 1)   

request access >  login >
Description: 17lsp1s_Area40FinalSubmittal_EPC
Type: Base Case
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities