Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1981 - 2000 out of 3185.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  


12/15/2010 Summary For Web Conference (v: 1)   

Summary16Dec10.doc   download>
Type: Report
Status: DRAFT
Contact

 

12/15/2010 ATNI Talking Points (v: 1)   

ATNITalkingPointsedit[1].pdf   download>
Description: ATNI Talking Points
Type: Document (pdf)
Status: DRAFT

 

12/15/2010 ATNI Energy Update Fall 2010 (v: 1)   

ATNIEnergyUpdate2010FINAL .pdf   download>
Description: ATNI Energy Update Fall 2010
Type:
Status: DRAFT

 

12/14/2010 Transmission Planning Update (12 15 10) (v: 1)   

...onPlanningUpdate(12 15 10).pdf   download>
Description: Transmission Planning Update (12 15 10)
Type: Presentation
Status: FINAL
Contact

 

12/13/2010 Treasurer's Report (12.15.20) (v: 1)   

...asurer's Report (12.15.20).pdf   download>
Description: Treasurer's Report (12.15.20)
Type: Financial
Status: FINAL
Contact

 

12/13/2010 Computer, Internet and e-mail Policy (12.10.20) (v: 1)   

...Internet and e-mail Policy.pdf   download>
Description: Computer, Internet and e-mail Policy (12.10.20)
Type: Policy/Procedure
Status: FINAL
Contact

 

12/13/2010 Pre-Employment Screening Policy (12.10.10) (v: 1)   

...mployment Screening Policy.pdf   download>
Description: Pre-Employment Screening Policy (12.10.10)
Type: Policy/Procedure
Status: FINAL
Contact

 

12/13/2010 Records Retention Policy (12.15.10) (v: 1)   

Records Retention Policy.pdf   download>
Description: Records Retention Policy
Type:
Status: FINAL
Contact

 

12/13/2010 Whistleblower Policy (12.15.10) (v: 1)   

Whistleblower Policy.pdf   download>
Description: Whistleblower Policy
Type: Policy/Procedure
Status: FINAL
Contact

 

12/08/2010 PSE Attachment K PSAST Mtg 2010 (v: 1)   

PSEAttKPSATMtg(12-9-10).pdf   download>
Description: PSE Attachment K PSAST Mtg 2010
Type: Presentation
Status: DRAFT

 

12/06/2010 WIST Agenda (12.8.10) (v: 1)   

WIST12-8-10DraftAgenda.pdf   download>
Description: WIST Agenda 12.8.10
Type: Agenda
Status: DRAFT

 

11/16/2010 Multi-System Open Season Proposal (11.16.10) (v: 1)   

MSOS Proposal (11 16 10).pdf   download>
Description: Multi System Open Season Proposal (11.16.10)
Type: Document (pdf)
Status: DRAFT
Contact

 

12/03/2010 Action Items from 12.2.10 (v: 1)   

ActionItemsfrom12-2-10CGPM.pdf   download>
Description: Action Items from 12.2.10
Type: Minutes
Status: DRAFT
Contact

 

12/03/2010 2011 Study Requests (v: 1)   

2011StudyRequests.doc   download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact

 

12/03/2010 Draft Planning Agenda (1.27.11) (v: 1)   

aftPlanningAgenda(1-27-11).pdf   download>
Description: Planning Agenda (1.27.11)
Type: Agenda
Status: DRAFT

 

12/02/2010 Centralia Shutdown Study Plan Ver 2 (v: 1)   

...raliaShutdownStudyPlanVer2.doc   download>
Description: Centralia Shutdown Study Plan Ver 2
Type: Report
Status: DRAFT
Contact

 

12/02/2010 BPA Network Open Season Participation (v: 1)   

nos_results_notice_081910.pdf   download>
Description: BPA Network Open Season Participation
Type: Notice
Status: DRAFT

 

12/02/2010 Future work recommendations Local vs Remote from WIST report (v: 1)   

...nsLocalvsremoteWISTReport.docx   download>
Description: Future work recommendations Local vs Remote from WIST report
Type: Report
Status: DRAFT
Contact

 

12/01/2010 Adjacent Circuit Criteria (v: 1)   

AdjCir12-9-10.pdf   download>
Description: Adjacent Circuit Criteria
Type: Presentation
Status: DRAFT
Contact

 

12/01/2010 Board Notice (12.15.10) (v: 1)   

Board Notice (12.15.10).doc   download>
Description: Board Notice (12.15.10)
Type:
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance