Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2121 - 2140 out of 3154.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

05/18/2010 Intra-Hour TP Comparison as of 4-13-2010 (v: 1)   

...Comparison_as_of_4-13-2010.pdf   download>
Description: Intra-Hour TP Comparison as of 4-13-2010
Type: Document (pdf)
Status: FINAL

 

05/18/2010 Joint Initiative Intra hour scheduling BP talking points (v: 1)   

...heduling BP talking points.pdf   download>
Description: Joint Initiative Intra hour scheduling BP talking points
Type: Document (pdf)
Status: FINAL

 

05/18/2010 WECC Schedulers Meeting 4 Panelists (v: 1)   

...dulers_Meeting 4 Panelists.pdf   download>
Description: WECC Schedulers Meeting 4 Panelists
Type: Document (pdf)
Status: FINAL

 

05/18/2010 Intra-Hourly Scheduling (5.18.10) (v: 1)   

tra-Hrly_Sched_V1_10_16_09.pdf   download>
Description: Intra-Hourly Scheduling (5.18.10)
Type: Document (pdf)
Status: FINAL

 

05/18/2010 SCL Business Practice Intra-Hour Scheduling (5.18.10) (v: 1)   

...-Hour Scheduling 2010_0322.pdf   download>
Description: SCL Business Practice Intra-Hour Scheduling 2010_0322
Type: Document (pdf)
Status: FINAL

 

05/17/2010 18hw1-s SeedCase (v: 1)   

request access >  login >
Description: 18hw1-s SeedCase
Type: Base Case
Status: DRAFT

 

05/14/2010 Study Results Review (v: 1)   

tudyResultsReview_5-14-10.pptx   download>
Description: Study Results Review
Type: Presentation
Status: DRAFT
Contact

 

05/13/2010 AC Power Flow Studies to Confirm ATC Results (v: 1)   

...udy to confirm ATC results.ppt   download>
Type: Presentation
Status: FINAL
Contact

 

05/13/2010 Powerex Comments on PSAST Plan (v: 1)   

...fMiller)rePSAExpPln5.12.10.doc   download>
Description: Powerex Comments on PSAST Plan
Type: Comments
Status: DRAFT

 

05/12/2010 BPA/CG Meeting Minutes 4.23.10 (v: 1)   

...ingMinutes_04-23-10_v5 (2).doc   download>
Description: BPA/CG Meeting Minutes 4.23.10
Type: Minutes
Status: DRAFT

 

05/11/2010 Treasurer's Report (5.11.10) (v: 1)   

TreasurersReport(5.11.10).pdf   download>
Description: Treasurer's Report (5.11.10)
Type: Financial
Status: FINAL
Contact

 

05/11/2010 BPA Cost Estimate Request (v: 1)   

BPACostEstimateRequest.pdf   download>
Description: BPA Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact

 

05/11/2010 PSE Cost Estimate Request (v: 1)   

PSECostEstimateRequest.pdf   download>
Description: PSE Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact

 

05/11/2010 SCL Cost Estimate Request (v: 1)   

SCLCostEstimateRequest.pdf   download>
Description: SCL Cost Estimate Request
Type: Document (pdf)
Status: DRAFT
Contact

 

05/11/2010 2010 Biennial Expansion Plan Update (v: 1)   

2010BiennialPlan2.pdf   download>
Description: 2010 Biennial Expansion Plan Update
Type: Report
Status: FINAL

 

05/07/2010 PSAST Traditional Power Flow Files (2.6 MB .zip file) (v: 1)   

request access >  login >
Description: PowerWorld Case, aux files and diagrams for the Puget Sound Area Study Team
Type: Base Case
Status: DRAFT
Contact

 

05/04/2010 PSAST Action Items (5.14.10) (v: 1)   

...ea Study Team Action Items.doc   download>
Description: PSAST Action Items (5.14.10)
Type: Minutes
Status: DRAFT
Contact

 

05/13/2010 PSAST Agenda (5.14.10) (v: 2)   

PSAST_May14_Agenda_r1.pdf   download>
Description: PSAST Agenda (5.14.10)
Type: Agenda
Status: DRAFT
Contact

 

05/04/2010 PSAST Agenda (5.19.10) (v: 1)   

PSAST_May19_Agenda.pdf   download>
Description: PSAST Agenda (5.19.10)
Type: Agenda
Status: FINAL
Contact

 

04/29/2010 Board Minutes (02.17.10) (v: 1)   

BoardMinutes(02.17.10).pdf   download>
Description: Board Minutes (02.17.10)
Type: Minutes
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance