Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2201 - 2220 out of 3246.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163  

06/09/2010 Announcement of webExchange Subscription Agreements (60910) (v: 1)   

...ription Agreements (60910).pdf   download>
Description: Announcement of webExchange Subscription Agreements (60910).
Type:
Status: FINAL
Contact

 

06/09/2010 WIST Notes from 5.20.10 Mtg (v: 1)   

...Draft-NotesWISTMeeting5.20.doc   download>
Description: WIST Notes from 5.20.10 Mtg
Type: Minutes
Status: DRAFT

 

06/07/2010 Proposal for Standardization of Intra-hour Business Practices (6.07.10) (v: 1)   

...usinessPractices(6 7 10)-1.pdf   download>
Description: Proposal for Standardization of Intra-hour Business Practices (6 7 10)
Type: Document (pdf)
Status: FINAL
Contact

 

06/02/2010 Board Agenda (06.16.10) (v: 1)   

Board Agenda (06.16.10).pdf   download>
Description: Board Agenda (06.16.10)
Type: Agenda
Status: FINAL
Contact

 

06/02/2010 Board Notice (06.16.10) (v: 1)   

BoardNotice(06.16.10).pdf   download>
Description: Board Notice (06.16.10)
Type: Notice
Status: FINAL
Contact

 

05/28/2010 May 28, 2010 PSAST WebEx Data 1.1 MB compressed file (.zip) (v: 1)   

request access >  login >
Description: Files presented on the May 28th PSAST WebEx call
Type: Spreadsheet
Status: FINAL
Contact

 

05/27/2010 Power System Paradigm Shift (v: 1)   

WIST5-20-10.ppt   download>
Description: WIST Presentation (5.20.10)
Type: Presentation
Status: DRAFT

 

10/26/2010 BPA CG WIST Review of Dynamic Transfer Capability Studies (v: 1)   

WIST100520.pdf   download>
Description: WIST 5.20.10 Presentation
Type: Presentation
Status: DRAFT

 

05/20/2010 Wind Initiatives Matrix (v: 1)   

WindInitiativesMatrix1.xls   download>
Description: Wind Initiatives Matrix
Type: Spreadsheet
Status: DRAFT

 

05/19/2010 Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report (v: 1)   

request access >  login >
Description: Path 3 Northwest to BC Thermal Upgrade Project Phase 1 Path Rating Report
Type: Report
Status: DRAFT

 

05/19/2010 Comprehensive Progress Report for Path 3 NW - BC (v: 1)   

request access >  login >
Description: Comprehensive Progress Report for Path 3 NW - BC
Type: Report
Status: DRAFT

 

05/18/2010 WIST Agenda (5.20.10) (v: 1)   

WIST5-20-10DraftAgenda.pdf   download>
Description: Agenda WIST; WIST Agenda (5.20.10);
Type: Agenda
Status: DRAFT

 

05/18/2010 Intra-Hour TP Comparison as of 4-13-2010 (v: 1)   

...Comparison_as_of_4-13-2010.pdf   download>
Description: Intra-Hour TP Comparison as of 4-13-2010
Type: Document (pdf)
Status: FINAL

 

05/18/2010 Joint Initiative Intra hour scheduling BP talking points (v: 1)   

...heduling BP talking points.pdf   download>
Description: Joint Initiative Intra hour scheduling BP talking points
Type: Document (pdf)
Status: FINAL

 

05/18/2010 WECC Schedulers Meeting 4 Panelists (v: 1)   

...dulers_Meeting 4 Panelists.pdf   download>
Description: WECC Schedulers Meeting 4 Panelists
Type: Document (pdf)
Status: FINAL

 

05/18/2010 Intra-Hourly Scheduling (5.18.10) (v: 1)   

tra-Hrly_Sched_V1_10_16_09.pdf   download>
Description: Intra-Hourly Scheduling (5.18.10)
Type: Document (pdf)
Status: FINAL

 

05/18/2010 SCL Business Practice Intra-Hour Scheduling (5.18.10) (v: 1)   

...-Hour Scheduling 2010_0322.pdf   download>
Description: SCL Business Practice Intra-Hour Scheduling 2010_0322
Type: Document (pdf)
Status: FINAL

 

05/17/2010 18hw1-s SeedCase (v: 1)   

request access >  login >
Description: 18hw1-s SeedCase
Type: Base Case
Status: DRAFT

 

05/14/2010 Study Results Review (v: 1)   

tudyResultsReview_5-14-10.pptx   download>
Description: Study Results Review
Type: Presentation
Status: DRAFT
Contact

 

05/13/2010 AC Power Flow Studies to Confirm ATC Results (v: 1)   

...udy to confirm ATC results.ppt   download>
Type: Presentation
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Avista Corporation      Project: ColumbiaGrid     
Avista Corporation

"In ColumbiaGrid, we now have the ability to resolve the three fundamental transmission questions: What transmission facilities should be built? Who should build them? Who should pay for them? With ColumbiaGrid's independent staff and process to resolve disputes, we can answer these questions effectively and in a timely fashion to facilitate our region's new resource development needs."
~~ Jeff Schlect, Manager, Transmission Services, Avista