Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2381 - 2400 out of 3204.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161  

09/21/2009 Narrative of Wind Generation Sensitivity Study with New 10 Year Cases (v: 1)   

request access >  login >
Description: Narrative of Wind Generation Sensitivity Study with New 10 Year Cases
Type: Report
Status: DRAFT
Contact

 

09/21/2009 Narrative of 10 Year System Assessment Update Methodology (v: 1)   

request access >  login >
Description: Narrative of 10 Year System Assessment
Type: Report
Status: DRAFT
Contact

 

09/18/2009 ITAP Agreement of Interest (v: 1)   

ITAP Agreement of Interest.doc   download>
Description: ITAP Agreement of Interest
Type: Letter
Status: FINAL
Contact

 

09/18/2009 ITAP Business Case (v: 1)   

ITAP Business Case.pdf   download>
Description: ITAP Business Case
Type: Report
Status: FINAL
Contact

 

09/17/2009 Board Minutes (08.19.09) (v: 1)   

BoardMinutes(08.19.09).pdf   download>
Description: Board Minutes (08.19.09)
Type: Minutes
Status: FINAL
Contact

 

09/16/2009 Planning Update (09.16.09) (v: 1)   

PlanningUpdate(09.16.09).ppt   download>
Description: Planning Update (09.16.09)
Type: Report
Status: FINAL
Contact

 

09/16/2009 Restack Cluster Study (v: 1)   

...ack_Cluster_Study_09-19-09.pdf   download>
Description: Restack Cluster Study
Type: Report
Status: DRAFT

 

09/16/2009 2009 NOS Update (v: 1)   

2009_NOS_Update_09-15-09.pdf   download>
Description: 2009 NOS Update
Type: Report
Status: DRAFT

 

09/16/2009 2008 NOS Summary Timeline Map (v: 1)   

...8_NOS_Summary_Timeline_Map.pdf   download>
Description: 2008 NOS Summary Timeline Map
Type: Report
Status: DRAFT

 

09/16/2009 NOS PTSA Update (v: 1)   

08_NOS_PTSA_Update.pdf   download>
Description: NOS PTSA Update
Type: Report
Status: DRAFT

 

09/15/2009 Standard TPL-001-1 - Transmission System Planning Performance Requirements (v: 1)   

...1-1_Draft3_Clean_2009May26.pdf   download>
Description: Standard TPL-001-1 - Transmission System Planning Performance Requirements
Type: Report
Status: DRAFT

 

09/15/2009 Standard PRC-006-01 Automatic Underfrequency Load Shedding (v: 1)   

...UFLS_PRC-006-1_2009April20.pdf   download>
Description: Standard PRC-006-01 Automatic Underfrequency Load Shedding
Type: Report
Status: DRAFT

 

09/15/2009 Reliability Functional Model Technical Document V.5 (v: 1)   

...cument_V5_Clean_2009July21.pdf   download>
Description: Reliability Functional Model Technical Document V.5
Type: Report
Status: DRAFT

 

09/15/2009 FERC Tech Conf. Summary (09.03.09) (v: 1)   

...CTechConfSummary(09.03.09).pdf   download>
Description: FERC Technical Conference Summary (09.03.09)
Type: Report
Status: FINAL

 

09/15/2009 Treasurer's Report (09.16.09) (v: 1)   

easurer's Report(09.16.09).pdf   download>
Description: Treasurer's Report(09.16.09)
Type: Financial
Status: FINAL
Contact

 

09/14/2009 Tabbed Applicability Matrix (v: 1)   

...-TabbedApplicabilityMatrix.xls   download>
Description: Tabbed Applicability Matrix
Type: Spreadsheet
Status: DRAFT
Contact

 

09/14/2009 Wind Integration Model (v: 1)   

2WindIntegrationModel.pdf   download>
Description: Wind Integration Model
Type: Document (pdf)
Status: DRAFT

 

09/14/2009 Wind Integration Study Team 2009-09-10 (meeting minutes) (v: 1)   

...grationStudyTeam2009-09-10.doc   download>
Description: Wind Integration Study Team 2009-09-10 (meeting minutes)
Type: Minutes
Status: DRAFT

 

09/11/2009 JI Think Tank Agenda (9.29.09) (v: 1)   

...TankMeetingAgenda(9.29.09).pdf   download>
Description: JI Think Tank Agenda (9.29.09)
Type: Agenda
Status: FINAL
Contact

 

09/11/2009 Think Tank Meeting Notice (9.29.09). (v: 1)   

...TankMeetingNotice(9.29.09).pdf   download>
Description: Think Tank Meeting Notice(9.29.09)
Type: Notice
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities