Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2381 - 2400 out of 3593.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  


11/09/2010 Treasurer's Report (v: 1)   

...asurer's Report (11.08.10).pdf   download>
Description: Treasurer’s Report for YTD 2010 through October
Type: Financial
Status: FINAL
Contact

 

11/09/2010 Draft Planning Agenda (12.2.10) (v: 1)   

aftPlanningAgenda(12-2-10).pdf   download>
Description: Planning Mtg Agenda (12.2.10
Type: Agenda
Status: DRAFT

 

11/04/2010 Planning Meeting presentation (Marv) (v: 1)   

G Plg Mtg Exp Plg 11-4-10.pptx   download>
Description: Planning Meeting presentation (Marv)
Type: Presentation
Status: DRAFT
Contact

 

11/04/2010 Ten Year Plan (v: 1)   

TenYearPlan.xlsx   download>
Description: Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact

 

11/03/2010 WECC 10 Year Plan Update (v: 1)   

WECC10yearPlanUpdate.pdf   download>
Description: WECC 10 Year Plan Update
Type: Presentation
Status: DRAFT

 

11/03/2010 Puget Sound Transmission Expansion Plan Status 11.4.10 (v: 1)   

...ExpansionPlanStatus11-4-10.pdf   download>
Description: Puget Sound Transmission Expansion Plan Status 11.4.10
Type: Presentation
Status: DRAFT
Contact

 

11/03/2010 Sammamish-Lakeside-Talbot Sensitivity (PSAST) (v: 1)   

...e-TalbotSensitivity(PSAST).pdf   download>
Description: Sammamish-Lakeside-Talbot Sensitivity (PSAST)
Type: Presentation
Status: DRAFT
Contact

 

11/03/2010 Puget Sound Generation Levels (v: 1)   

PugetSoundGenerationLevels.pdf   download>
Description: Puget Sound Generation Levels
Type: Presentation
Status: DRAFT
Contact

 

11/03/2010 Walla Walla Area Wind Generation 10.29.10 (v: 1)   

...AreaWindGeneration10-29-10.pdf   download>
Description: Walla Walla Area Wind Generation 10.29.10
Type: Map
Status: DRAFT

 

11/03/2010 CAISO Technical Appendices for Renewable Integration Studies (v: 1)   

TechnicalAppendixfor20%.pdf   download>
Description: CAISO Technical Appendices for Renewable Integration Studies
Type: Presentation
Status: DRAFT

 

11/03/2010 CAISOIntegration of Renewable Resources (v: 1)   

ISOstudyofthe20%renewables.pdf   download>
Description: CAISOIntegration of Renewable Resources
Type: Presentation
Status: DRAFT

 

11/03/2010 Presentation on CAISO intermittent dynamic transfer capability (v: 1)   

CAISO-DTS-COI-WOR.pdf   download>
Description: Presentation on CAISO intermittent dynamic transfer capability
Type: Presentation
Status: DRAFT

 

11/03/2010 PowerTech Dynamic Scheduling Final Report (v: 1)   

...namicSchedulingFinalReport.pdf   download>
Description: PowerTech Dynamic Scheduling Final Report
Type: Report
Status: FINAL

 

10/29/2010 BPA Dynamic Transfer Limit Study Methodology (v: 1)   

DTLS_methodology_F.pdf   download>
Description: DTLS Methodology F Presentation
Type: Presentation
Status: DRAFT

 

10/29/2010 Idaho DTC Study Slides (v: 1)   

IPCO-DTLStudy-Background.pdf   download>
Description: Idaho DTC Study Slides
Type: Presentation
Status: DRAFT

 

10/29/2010 Notice (11.19.10) (v: 1)   

11.19.10 Notice.pdf   download>
Description: Joint Initiative Think Tank Balancing Market Brainstorming Session Notice
Type: Notice
Status: FINAL

 

10/26/2010 MSOS Process Proposal (10.27.10) (v: 1)   

...ocess Proposal draft 10_24.pdf   download>
Description: MSOS Process Proposal (10.27.10) Draft
Type: Document (pdf)
Status: DRAFT

 

10/26/2010 MSOS Working Document (10.27.10) (v: 1)   

...orking Document (10.26.10).pdf   download>
Description: MSOS Working Document
Type: Document (pdf)
Status: DRAFT

 

10/22/2010 12HS3-S Seed Case (1.4 MB .zip file) (v: 1)   

request access >  login >
Description: 12HS3-S Seed Case for the Northwest
Type: Base Case
Status: DRAFT
Contact

 

10/21/2010 Member Meeting Minutes (10-20-10) (v: 1)   

MemberMtgminutes(10-20-10).pdf   download>
Description: Member Meeting Minutes (10-20-10)
Type: Minutes
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities