Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2401 - 2420 out of 3607.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181  

11/16/2010 Multi-System Open Season Proposal (11.16.10) (v: 1)   

MSOS Proposal (11 16 10).pdf   download>
Description: Multi System Open Season Proposal (11.16.10)
Type: Document (pdf)
Status: DRAFT
Contact

 

12/03/2010 Action Items from 12.2.10 (v: 1)   

ActionItemsfrom12-2-10CGPM.pdf   download>
Description: Action Items from 12.2.10
Type: Minutes
Status: DRAFT
Contact

 

12/03/2010 2011 Study Requests (v: 1)   

2011StudyRequests.doc   download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact

 

12/03/2010 Draft Planning Agenda (1.27.11) (v: 1)   

aftPlanningAgenda(1-27-11).pdf   download>
Description: Planning Agenda (1.27.11)
Type: Agenda
Status: DRAFT

 

12/02/2010 Centralia Shutdown Study Plan Ver 2 (v: 1)   

...raliaShutdownStudyPlanVer2.doc   download>
Description: Centralia Shutdown Study Plan Ver 2
Type: Report
Status: DRAFT
Contact

 

12/02/2010 BPA Network Open Season Participation (v: 1)   

nos_results_notice_081910.pdf   download>
Description: BPA Network Open Season Participation
Type: Notice
Status: DRAFT

 

12/02/2010 Future work recommendations Local vs Remote from WIST report (v: 1)   

...nsLocalvsremoteWISTReport.docx   download>
Description: Future work recommendations Local vs Remote from WIST report
Type: Report
Status: DRAFT
Contact

 

12/01/2010 Adjacent Circuit Criteria (v: 1)   

AdjCir12-9-10.pdf   download>
Description: Adjacent Circuit Criteria
Type: Presentation
Status: DRAFT
Contact

 

12/01/2010 Board Notice (12.15.10) (v: 1)   

Board Notice (12.15.10).doc   download>
Description: Board Notice (12.15.10)
Type:
Status: FINAL
Contact

 

12/01/2010 Board Agenda (12.15.10) (v: 1)   

BoardAgenda(12.15.10).doc   download>
Description: Board Agenda (12.15.10)
Type: Agenda
Status: FINAL
Contact

 

12/01/2010 Centralia Shutdown Study Plan (v: 1)   

CentraliaShutdownStudyPlan.pdf   download>
Description: Centralia Shutdown Study Plan
Type: Report
Status: DRAFT
Contact

 

12/01/2010 WECC 10-Year Plan Update (v: 1)   

WECC10yearPlanUpdate.pdf   download>
Description: WECC 10-Year Plan Update
Type: Report
Status: DRAFT
Contact

 

12/01/2010 CAISO Wind Ramp Plots 2009 spreadsheet (v: 1)   

CAISO.WindRampPlots2009.xls   download>
Description: CAISO Wind Ramp Plots 2009 spreadsheet
Type: Spreadsheet
Status: DRAFT

 

12/01/2010 PSAST Agenda (12.9.10) (v: 1)   

PSAST_Dec9_Agenda.pdf   download>
Description: PSAST Agenda 12.9.10
Type: Agenda
Status: DRAFT
Contact

 

11/19/2010 2011 Biennial Plan CEII Attachments (Zipped File) (v: 1)   

request access >  login >
Description: 2011 Biennial Plan CEII Attachments (Zipped File)
Type: Spreadsheet
Status: DRAFT

 

11/18/2010 JI Think Tank Agenda (11.19.10) (v: 1)   

11 19 10 Proposed Agenda.pdf   download>
Description: Proposed Agenda for 11.19.10
Type: Agenda
Status: FINAL
Contact

 

11/17/2010 CIRED Flicker Objectives (v: 1)   

CIRED2009_0755_Paper.pdf   download>
Description: CIRED Flicker Objectives
Type: Document (pdf)
Status: DRAFT

 

11/15/2010 2009 BPA Wind Ramp Plots (v: 1)   

RAFT-2009BPA-WindRampPlots.xls   download>
Description: 2009 BPA Wind Ramp Plots
Type: Spreadsheet
Status: DRAFT

 

11/15/2010 PacifiCorp Wind Variability Graph for 2010 (v: 1)   

..._Wind_Variability_PAC_2010.pdf   download>
Description: PacifiCorp Wind Variability Graph for 2010
Type: Charts
Status: DRAFT

 

11/15/2010 CAISO Wind Profile 2009 (v: 1)   

CAISOWindProfile2009.xls   download>
Description: CAISO Wind Profile 2009
Type: Spreadsheet
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities