Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2441 - 2460 out of 3154.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

06/11/2009 Overload Comparison Enhanced List (v: 1)   

request access >  login >
Description: Overload Comparison Enhanced List
Type: Spreadsheet
Status: DRAFT
Contact

 

06/10/2009 Basecase/Wind Diagrams (v: 1)   

basecasediagrams.pdf   download>
Description: Basecase/Wind Diagrams
Type: Presentation
Status: DRAFT
Contact

 

06/09/2009 Weighted TCRM Generation Heavy Loading (v: 1)   

WgtdTCRM _ GenHvyLoading.pdf   download>
Description: Weighted TCRM Generation Heavy Loading
Type: Spreadsheet
Status: DRAFT
Contact

 

06/10/2009 Overload Comparison Table (v: 2)   

request access >  login >
Description: Overload Comparison Table
Type: Spreadsheet
Status: DRAFT
Contact

 

06/08/2009 2009 System Assessment 6-8-09 draft (v: 1)   

...ystemAssessment6-8-09draft.doc   download>
Description: 2009 System Assessment 6-8-09 draft
Type: Report
Status: DRAFT
Contact

 

06/08/2009 Col Grid 2009 Transmission Plan Draft (2) (v: 2)   

...09TransmissionPlanDraft(2).xls   download>
Description: Col Grid 2009 Transmission Plan Draft (2)
Type: Spreadsheet
Status: DRAFT
Contact

 

06/08/2009 PSAST Agenda (6.16.09) (v: 1)   

PSASTAgenda(06.16.09).pdf   download>
Description: PSAST Agenda (06.16.09)
Type: Agenda
Status: DRAFT
Contact

 

06/05/2009 Cost Comparison (v: 1)   

CostComp.pdf   download>
Description: Cost Comparison for N. Mid C
Type: Spreadsheet
Status: DRAFT
Contact

 

06/05/2009 Northern Mid C Agenda (6.9.09) (v: 1)   

Agenda(5.28.09).pdf   download>
Description: NMC Agenda
Type: Agenda
Status: DRAFT

 

06/03/2009 Board Agenda (6.17.09) (v: 1)   

BoardAgenda(6.17.09).pdf   download>
Description: Board Agenda (6.17.09)
Type: Agenda
Status: FINAL
Contact

 

06/03/2009 Board Notice (6.17.09) (v: 1)   

BoardNotice(6.17.09).pdf   download>
Description: Board Notice (6.17.09)
Type: Notice
Status: FINAL
Contact

 

06/01/2009 Virtual Control Area Presentation (v: 1)   

VirtualControlArea_6-1-09.pdf   download>
Description: Virtual Control Area Presentation
Type: Presentation
Status: DRAFT

 

06/01/2009 NREL PNNL Think Tank Presentation (v: 1)   

...-PNNLThinkTank(jun01-2009).pdf   download>
Description: NREL PNNL Think Tank Presentation
Type: Presentation
Status: DRAFT

 

05/22/2009 JI Think Tank Mtg Notice (6.01.09) (v: 1)   

hinkTankMtgNotice(6.01.09).pdf   download>
Description: Joint Initiative Think Tank Meeting Notice (6.01.09)
Type: Notice
Status: FINAL
Contact

 

05/22/2009 Boise Map of Hotels (v: 1)   

idahomaphotels.pdf   download>
Description: Boise Map of Hotels
Type: Document (pdf)
Status: FINAL

 

05/22/2009 Northern Mid C Agenda (5.28.09) (v: 1)   

NMCST Agenda 5-28-09.doc   download>
Description: North Mid Columbia Study Team Agenda
Type: Agenda
Status: DRAFT

 

05/21/2009 Board Minutes (04.15.09) (v: 1)   

BoardMinutes(04.15.09).pdf   download>
Description: Board Minutes (04.15.09)
Type: Minutes
Status: FINAL
Contact

 

05/21/2009 WIST Update (BPA) (v: 1)   

WISTUpdate090521.pdf   download>
Description: WIST Update (BPA)
Type: Presentation
Status: DRAFT

 

05/21/2009 Wind Analysis (v: 1)   

WindAnalysis(2)5.21.09.pdf   download>
Description: Wind Analysis
Type: Presentation
Status: DRAFT
Contact

 

05/20/2009 Attendance List (5.20.09) (v: 1)   

AttendanceList(5.20.09).pdf   download>
Description: Attendance List (5.20.09)
Type: Attendence Sheets
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance