Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2461 - 2480 out of 3226.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162  

08/18/2009 Joint Initiative ColumbiaGrid Board Briefing (08 19 09) (v: 1)   

...ridBoardBriefing(08 19 09).pdf   download>
Description: Joint Initiative ColumbiaGrid Board Briefing (08 19 09)
Type: Presentation
Status: FINAL
Contact

 

08/18/2009 Joint Intervention PEFA (v: 1)   

Joint Intervention PEFA.pdf   download>
Description: Joint Intervention PEFA
Type: Filing
Status: FINAL
Contact

 

08/18/2009 Proposed Comparability Revisions (8.10.09) (v: 1)   

...rabilityRevisions(8.10.09).pdf   download>
Description: Proposed Comparability Revisions (8.10.09)
Type: Document (pdf)
Status: FINAL
Contact

 

08/18/2009 Proposed CG Cost Allocation Revisions (8.10. 09) (v: 1)   

...ocationRevisions(8.10. 09).pdf   download>
Description: Proposed CG Cost Allocation Revisions (8.10. 09)
Type: Document (pdf)
Status: FINAL
Contact

 

08/18/2009 Planning Update (08.19.09) (v: 1)   

Planning Update (08.19.09).pdf   download>
Description: Planning Update (08.19.09)
Type: Presentation
Status: FINAL
Contact

 

08/18/2009 Treasurer's Report (8.19.09) (v: 1)   

Treasurer'sReport(8.19.09).pdf   download>
Description: Treasurer's Report (8.19.09)
Type: Financial
Status: FINAL
Contact

 

08/18/2009 ColumbiaGrid Rehearing Request (FINAL) (v: 1)   

...umbiaGridReh'gRequestFINAL.pdf   download>
Description: ColumbiaGrid Rehearing Request FERC filing (FINAL)
Type: Filing
Status: FINAL
Contact

 

08/18/2009 Action Items from 8.6.09 Mtg (v: 1)   

ActionItemsfrom8-6-09CGPM.pdf   download>
Description: Action Items from 8.6.09 Mtg
Type: Document (pdf)
Status: DRAFT
Contact

 

08/17/2009 Embassy Suites Hotel (v: 1)   

Embassy Suites Flyer.pdf   download>
Description: Embassy Suites flyer with ColumbiaGrid rates
Type: Document (pdf)
Status: FINAL

 

08/12/2009 PPL Energy Plus Comments (v: 1)   

PPL_Energy_Plus_Comments.pdf   download>
Description: PPL Energy Plus Comments of draft Garrison Pumped Storage study results
Type: Comments
Status: DRAFT

 

08/11/2009 Draft Planning Agenda (9.22.09) (v: 1)   

PlanningAgenda(9.22.09).pdf   download>
Description: Planning Agenda (9.22.09)
Type: Agenda
Status: DRAFT

 

08/10/2009 Meeting Notes & Action Items (v: 1)   

...072109MtgNotes&ActionItems.pdf   download>
Description: Meeting Notes & Action Items
Type: Notes
Status: DRAFT

 

08/10/2009 WECC TEPPC 2012 Update (v: 1)   

...PPC 2012 Update_21July (2).pdf   download>
Description: WECC TEPPC 2012 Update
Type: Report
Status: FINAL

 

08/10/2009 Wind Model (v: 1)   

Wind Model.pdf   download>
Description: Wind Model
Type: Presentation
Status: FINAL

 

08/06/2009 Pages from Transmission Conference Agenda (v: 1)   

...omTrans.ConfAgenda(8.6.09).pdf   download>
Description: Pages from Transmission Conference Agenda
Type: Report
Status: DRAFT

 

08/06/2009 Cost Comp (v: 1)   

CostComp(8.7.09).pdf   download>
Description: Cost Comp
Type: Spreadsheet
Status: DRAFT
Contact

 

08/06/2009 Trojan-Horizon Presentation (v: 1)   

...orizonPresentation(8-6-09).pdf   download>
Description: Trojan-Horizon Presentation
Type: Presentation
Status: DRAFT

 

08/05/2009 NOS Update (v: 1)   

...anningMtgNOSUpdate(8.6.09).pdf   download>
Description: NOS Update
Type: Presentation
Status: DRAFT

 

08/05/2009 System Assessment Presentation (v: 1)   

...ssmentPresentation(8.6.09).pdf   download>
Description: System Assessment Presentation
Type: Presentation
Status: DRAFT
Contact

 

08/05/2009 Canada - Pacific NW - N. California Transmission Project (v: 1)   

CNC-BEM(8.06.2009).pdf   download>
Description: Canada - Pacific NW - N. California Transmission Project
Type: Presentation
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Avista Corporation      Project: ColumbiaGrid     
Avista Corporation

"In ColumbiaGrid, we now have the ability to resolve the three fundamental transmission questions: What transmission facilities should be built? Who should build them? Who should pay for them? With ColumbiaGrid's independent staff and process to resolve disputes, we can answer these questions effectively and in a timely fashion to facilitate our region's new resource development needs."
~~ Jeff Schlect, Manager, Transmission Services, Avista