Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2601 - 2620 out of 3621.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182  

04/07/2010 16LA1-S Draft PreRunSubmittal 1.4 MB compressed file (.zip) (v: 1)   

request access >  login >
Description: 2016 light autumn 1 scenario case, draft prerun submittal
Type: Base Case
Status: DRAFT
Contact

 

04/07/2010 Traditional Power Flow Studies for 4_8_2008 (2.5 MB) (v: 1)   

request access >  login >
Description: Traditional power flow studies for Puget Sound area
Type: Presentation
Status: FINAL
Contact

 

04/07/2010 Board Agenda (04.21.10) (v: 1)   

Board Agenda (04.21.10).pdf   download>
Description: Board Agenda (04.21.10)
Type: Agenda
Status: FINAL
Contact

 

04/07/2010 Board Notice (04.21.10) (v: 1)   

BoardNotice(04.21.10).pdf   download>
Description: Board Notice (04.21.10)
Type: Notice
Status: FINAL
Contact

 

04/07/2010 New 500/230 kV transformer loadings (v: 1)   

request access >  login >
Description: Summary tables showing the loadings for 230 kV low side transformers with new transformers added at various locations
Type: Spreadsheet
Status: DRAFT
Contact

 

04/07/2010 TEPPC Northwest Additional Wind Cases (4.6.10) (v: 1)   

PPCNWAddWindCases(4.6.10).docx   download>
Description: TEPPC Northwest Additional Wind Cases (4.6.10)
Type: Report
Status: DRAFT

 

04/07/2010 Summary of 2009 WIST Wind Analysis (4.6.10) (v: 1)   

...9WISTWindAnalysis(4.6.10).docx   download>
Description: Summary of 2009 WIST Wind Analysis (4.6.10)
Type: Report
Status: DRAFT

 

04/07/2010 Summary Western Wind Solar Integration Study RH (v: 1)   

...indSolarIntegrationStudyRH.doc   download>
Description: Summary Western Wind Solar Integration Study RH
Type: Report
Status: DRAFT

 

04/07/2010 WIST Report Gibson Sections (4.6.10) (v: 1)   

STreptGibsonsections6Apr10.doc   download>
Description: WIST Report Gibson Sections (4.6.10)
Type: Report
Status: DRAFT

 

04/06/2010 BPA comments on Puget Sound Area Transmission Expansion Plan (v: 1)   

...3-23-2010_reviewShortTPPv1.pdf   download>
Description: BPA comments on Puget Sound Area Transmission Expansion Plan
Type: Comments
Status: DRAFT

 

04/05/2010 PSAST Agenda (4.8.10) (v: 1)   

PSAST_April8_Agenda_r1.pdf   download>
Description: PSAST Agenda (4.8.10)
Type: Agenda
Status: DRAFT
Contact

 

04/02/2010 Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10 (v: 1)   

...nSceduleCostEstimate4-2-10.doc   download>
Description: Puget Sound Area Transmission Plan Schedule & Cost Estimate 4.2.10
Type: Report
Status: DRAFT
Contact

 

04/02/2010 Puget Sound Area Study Team Action Items (v: 1)   

...ndAreaStudyTeamActionItems.doc   download>
Description: Puget Sound Area Study Team Action Items
Type: Minutes
Status: DRAFT
Contact

 

04/02/2010 Power Flow Results for Two Minimum Generation Levels (v: 1)   

request access >  login >
Description: Conventional power flow analysis results for two Puget Sound area minimum generation levels
Type:
Status: DRAFT
Contact

 

04/02/2010 TEPPC-Northwest Additional Wind Cases (v: 1)   

...rthwestAdditionalWindCases.doc   download>
Description: TEPPC-Northwest Additional Wind Cases
Type: Report
Status: DRAFT

 

04/02/2010 Addendum to NMC Report (v: 1)   

request access >  login >
Description: Addendum to NMC Report
Type: Report
Status: DRAFT
Contact

 

04/02/2010 Wind Integration Model (v: 1)   

WindIntegrationModel.xlsm   download>
Description: Wind Integration Model
Type:
Status: DRAFT

 

04/02/2010 WIST 072109Mtg Notes & Action Items (v: 1)   

...72109MtgNotes&ActionItems1.pdf   download>
Description: WIST 072109Mtg Notes & Action Items
Type: Minutes
Status: DRAFT

 

04/02/2010 Wind Integration Study Team 2009-09-10 (v: 1)   

...rationStudyTeam2009-09-101.doc   download>
Description: Wind Integration Study Team 2009-09-10
Type:
Status: DRAFT

 

04/02/2010 Simple Integration Model Studies (v: 1)   

...pleIntegrationModelStudies.pdf   download>
Description: Simple Integration Model Studies
Type:
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance