Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2661 - 2680 out of 3185.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  


12/29/2008 ATNIEnergyConf_March09 (v: 1)   

...rgyConf_March09 (12.17.09).pdf   download>
Description: ATNI Energy Conference March 16-18, 2009
Type: Notice
Status: FINAL

 

12/29/2008 Load Growth Est. By Owner (v: 1)   

confidentiality agreement required >
Description: Load Growth Est. By Owner
Type: Spreadsheet
Status: FINAL
Contact

 

12/29/2008 Load Growth Est. By Zone (v: 1)   

confidentiality agreement required >
Description: Load Growth Estimates By Zone
Type: Base Case
Status: FINAL
Contact

 

12/22/2008 12.18.08_Mtg JI Infrastructure Mtg Notes (v: 1)   

...I Infrastructure Mtg Notes.pdf   download>
Description: 12.18.08 JI Infrastructure Meeting Notes
Type: Notes
Status: FINAL

 

12/17/2008 ColumbiaGrid NOS Cluster Study Summary (12.16.08)v.5 (v: 1)   

...SClusterStudySum(12-16-08).pdf   download>
Description: ColumbiaGrid NOS Cluster Study Summary (12.16.08)v.5
Type: Presentation
Status: DRAFT

 

12/17/2008 Member Meeting Presentation (v: 1)   

MemberMtg12162008 (2).pdf   download>
Description: Member Meeting Presentation
Type: Presentation
Status: FINAL
Contact

 

12/16/2008 PEFA Board Presentation 12-17-08 (v: 1)   

...sentation 12-17-08 - rev 1.pdf   download>
Description: PEFA Board Presentation 12-17-08
Type: Presentation
Status: FINAL
Contact

 

12/16/2008 Joint Initiative Presentation 12.17.08 (v: 1)   

...Init Presentation 12.17.08.pdf   download>
Description: Joint Initiative Presentation 12.17.08
Type: Presentation
Status: FINAL
Contact

 

12/15/2008 Draft Planning Agenda (12.16.08) (v: 1)   

...Planning Agenda (12-16-08).pdf   download>
Description: Draft Planning Agenda (12-16-08)
Type: Agenda
Status: FINAL

 

12/15/2008 2009-2019 Transmission Expansion Plan Draft Presentation (v: 1)   

TxExpPlan(12.16.08).pdf   download>
Description: 2009-2019 Transmission Expansion Plan Draft Presentation
Type: Presentation
Status: DRAFT
Contact

 

12/15/2008 Northern Mid C Agenda (12-17-08) (v: 1)   

NMCST Agenda 12-17-08.doc   download>
Description: North Mid Columbia Study Team December 17 meeting agenda
Type: Agenda
Status: FINAL

 

12/03/2008 Study Request to TEPPC 2008 (v: 1)   

tudy Request to TEPPC 2008.pdf   download>
Description: Study Request to TEPPC 2008
Type: Letter
Status: FINAL
Contact

 

12/15/2008 Treasurer's Report (12.15.08) (v: 1)   

TreasurerReport(12.17.08).pdf   download>
Description: Treasurer's Report
Type: Financial
Status: FINAL
Contact

 

12/15/2008 NWPP Voluntary Northwest Transmission Adequacy Guidelines (v: 1)   

TAG_V0_final.doc   download>
Description: NWPP Voluntary Northwest Transmission Adequacy Guidelines
Type: Report
Status: DRAFT
Contact

 

12/15/2008 PEFA Primer (v: 1)   

PEFA PrimerRev2.pdf   download>
Description: PEFA Primer
Type: Presentation
Status: DRAFT
Contact

 

12/12/2008 2009 System Assessment Preparation Supporting Data (v: 1)   

request access >  login >
Description: 16dec08, 2009 System Assessment Preparation Supporting Data
Type: Base Case
Status: FINAL
Contact

 

12/12/2008 2009 CG System Assessment (v: 1)   

...9 CG System Assessment (2).pdf   download>
Description: 2009 CG System Assessment Presentation
Type: Presentation
Status: FINAL
Contact

 

12/11/2008 (12.10.0) Infrastructure Workgroup Update - Notes (v: 1)   

12.10.08InfWGUpdate_notes.ppt   download>
Description: Infrastructure Workgroup Update - Notes
Type: Presentation
Status: FINAL

 

12/11/2008 NL Phase 1 Covering Letter Final 20081210 (v: 1)   

...ring Letter Final 20081210.pdf   download>
Description: NL Phase 1 Covering Letter Final 20081210
Type: Letter
Status: FINAL

 

12/10/2008 NorthernLights Comprehensive Progress Report (v: 1)   

...prehensive Progress Report.pdf   download>
Description: NorthernLights Comprehensive Progress Report
Type: Report
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance