Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2861 - 2880 out of 3154.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

05/20/2008 TCRM Data Structure (v: 1)   

TCRM Data Structure.xls   download>
Description: TCRM Data Structure
Type: Spreadsheet
Status: DRAFT
Contact

 

05/20/2008 Nomogram Simulation Scripting Draft Scope Rev (v: 1)   

...g Draft Scope Rev May 2008.doc   download>
Description: Nomogram Simulation Scripting Draft Scope Rev
Type: Report
Status: DRAFT
Contact

 

05/20/2008 PSAST TCRM Script (v: 1)   

PSAST TCRM Script.ppt   download>
Description: PSAST TCRM Script
Type: Presentation
Status: DRAFT
Contact

 

05/19/2008 PSAST Agenda (5.20.08) (v: 1)   

Agenda 5-20-08r1.pdf   download>
Description: PSAST Agenda (5.20.08)
Type: Agenda
Status: FINAL

 

05/19/2008 BPA Transmission Outage Coordination Presentation (5.12.08) (v: 1)   

...Presentation mrv_sbh_rev 1.pdf   download>
Description: Outage Coordination Presentation by BPA/Munro(5.12.08)
Type: Presentation
Status: FINAL

 

05/19/2008 NI Nomogram Analysis (v: 1)   

NI Nomogram Analysis.pdf   download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL

 

05/19/2008 TCRM Nomograms Comparison (v: 1)   

TCRM Nomograms Summary.pdf   download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL

 

05/19/2008 Rating Study Plan (v: 1)   

Rating Study Plan 09may08.pdf   download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL

 

05/21/2008 IP Impact (5.21.08) (v: 1)   

IP_Impact.pdf   download>
Type: Spreadsheet
Status: FINAL
Contact

 

05/16/2008 COS Presentation (v: 1)   

COS Presentation.pdf   download>
Description: NWPP COS Presentation
Type: Presentation
Status: FINAL

 

05/16/2008 Coordinated Outage Process Chart (5.12.08) (v: 1)   

BPA-Munro Presentation.pdf   download>
Description: BPA-Munro Presentation - Coordination Outage Process
Type: Presentation
Status: FINAL

 

05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)   

...t PSAST TCRA Study Plan V6.pdf   download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact

 

05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 BCTC System Operating Order 7T -64 (v: 1)   

SOO7T-64_12jul07.pdf   download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)   

...of 436Winter08_SNL_results.pdf   download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)   

...of 436Winter08_SNH_results.PDF   download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/09/2008 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)   

...e 1 study plan 23apr08 (2).pdf   download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact

 

05/21/2008 Action Items from April 2008 Mtg (v: 1)   

ActionItems22April2008.pdf   download>
Description: Action Items fron April 22, 2008 Meeting
Type: Document (pdf)
Status: DRAFT
Contact

 

05/21/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan.pdf   download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities