Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2901 - 2920 out of 3204.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161  

05/28/2008 Board Minutes (04.16.08) (v: 1)   

BdMinutes(04.16.08).pdf   download>
Description: Board Minutes (04.16.08)
Type: Minutes
Status: FINAL
Contact

 

05/22/2008 Attendence Sheet (05.21.08) (v: 1)   

AttendenceSheet(05.21.08)1.pdf   download>
Description: Attendence Sheet (05.21.08)
Type: Attendence Sheets
Status: FINAL
Contact

 

05/21/2008 Energy Horizon (v: 1)   

energyhorizon.pdf   download>
Description: Energy Horizon
Type: Presentation
Status: DRAFT

 

05/21/2008 Election of CG Director (5.21.08) (v: 1)   

Election of CG Director.pdf   download>
Description: Election of CG Director
Type: Letter
Status: FINAL
Contact

 

05/21/2008 Reliability Activities Report(05 21 08) (v: 1)   

...ities Report(05 21 08) (2).pdf   download>
Description: Reliability Activities Report(05 21 08)
Type: Presentation
Status: FINAL
Contact

 

05/21/2008 NTTG_CG Joint Initiatives (v: 1)   

...G Joint InitiativesRevised.pdf   download>
Description: NTTG_CG Joint Initiatives
Type: Presentation
Status: DRAFT
Contact

 

05/20/2008 Planning Report (v: 1)   

Planning(05.21.08).pdf   download>
Description: Planning Report
Type: Presentation
Status: DRAFT
Contact

 

05/20/2008 N I Summer 2008 Operating Nomograms (FINAL) (v: final)   

... Operating Nomograms_FINAL.pdf   download>
Description: Northern Intertie Summer 2008 Operating Nomograms (FINAL)
Type:
Status: FINAL

 

05/20/2008 May 2008 Treasurer's Report (v: 1)   

ay 2008 Treasurer's Report.pdf   download>
Description: May 2008 Treasurer's Report
Type: Financial
Status: FINAL
Contact

 

05/20/2008 DCPUD_T-Line Overview (v: 1)   

DCPUD_T-Line Overview.pdf   download>
Description: DCPUD_T-Line Overview
Type: Document (pdf)
Status: DRAFT
Contact

 

05/20/2008 TCRM Data Structure (v: 1)   

TCRM Data Structure.xls   download>
Description: TCRM Data Structure
Type: Spreadsheet
Status: DRAFT
Contact

 

05/20/2008 Nomogram Simulation Scripting Draft Scope Rev (v: 1)   

...g Draft Scope Rev May 2008.doc   download>
Description: Nomogram Simulation Scripting Draft Scope Rev
Type: Report
Status: DRAFT
Contact

 

05/20/2008 PSAST TCRM Script (v: 1)   

PSAST TCRM Script.ppt   download>
Description: PSAST TCRM Script
Type: Presentation
Status: DRAFT
Contact

 

05/19/2008 PSAST Agenda (5.20.08) (v: 1)   

Agenda 5-20-08r1.pdf   download>
Description: PSAST Agenda (5.20.08)
Type: Agenda
Status: FINAL

 

05/19/2008 BPA Transmission Outage Coordination Presentation (5.12.08) (v: 1)   

...Presentation mrv_sbh_rev 1.pdf   download>
Description: Outage Coordination Presentation by BPA/Munro(5.12.08)
Type: Presentation
Status: FINAL

 

05/19/2008 NI Nomogram Analysis (v: 1)   

NI Nomogram Analysis.pdf   download>
Description: NI Nomogram Analysis
Type: Spreadsheet
Status: FINAL

 

05/19/2008 TCRM Nomograms Comparison (v: 1)   

TCRM Nomograms Summary.pdf   download>
Description: TCRM Nomograms Comparison for 2003-2008
Type: Presentation
Status: FINAL

 

05/19/2008 Rating Study Plan (v: 1)   

Rating Study Plan 09may08.pdf   download>
Description: NW - BC (Path3) Phase 1 Path Rating Study Plan presented to PSAST Ma6 20, 2008 meeting
Type: Presentation
Status: FINAL

 

05/21/2008 IP Impact (5.21.08) (v: 1)   

IP_Impact.pdf   download>
Type: Spreadsheet
Status: FINAL
Contact

 

05/16/2008 COS Presentation (v: 1)   

COS Presentation.pdf   download>
Description: NWPP COS Presentation
Type: Presentation
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance