Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

2921 - 2940 out of 3204.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161  

05/16/2008 Coordinated Outage Process Chart (5.12.08) (v: 1)   

BPA-Munro Presentation.pdf   download>
Description: BPA-Munro Presentation - Coordination Outage Process
Type: Presentation
Status: FINAL

 

05/15/2008 Draft PSAST TCRA Study Plan V6 (v: draft)   

...t PSAST TCRA Study Plan V6.pdf   download>
Description: Draft PSAST TCRA Study Plan version 6
Type: Document (pdf)
Status: DRAFT
Contact

 

05/14/2008 Summer 07 Nomograms for NI-Light Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer 07 Nomograms for NI-Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 BCTC System Operating Order 7T -64 (v: 1)   

SOO7T-64_12jul07.pdf   download>
Description: BCTC System Operating Order 7T -64 12jul07
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 Summer 07 Nomograms for NI-Heavy Load (v: 1)   

...(100) All Lines In Service.pdf   download>
Description: Summer Nomograms for NI for Ingledow-Custer, heavy load
Type: Spreadsheet
Status: FINAL
Contact

 

05/14/2008 Winter 08 Nomograms for NI Light Load (v: 1)   

...of 436Winter08_SNL_results.pdf   download>
Description: Winter Nomograms for NI Ingledow-Custer, Light Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/13/2008 Winter 08 Nomograms for NI-Heavy Load (v: 1)   

...of 436Winter08_SNH_results.PDF   download>
Description: Winter 08 Nomograms for NI-Ingledow-Custer, Heavy Load
Type: Spreadsheet
Status: FINAL
Contact

 

05/09/2008 Path 3 Phase 1 Study Plan 23apr08 (2) (v: draft)   

...e 1 study plan 23apr08 (2).pdf   download>
Description: Path 3 Phase 1 Study Plan 23apr08 (2)
Type: Document (pdf)
Status: DRAFT
Contact

 

05/21/2008 Action Items from April 2008 Mtg (v: 1)   

ActionItems22April2008.pdf   download>
Description: Action Items fron April 22, 2008 Meeting
Type: Document (pdf)
Status: DRAFT
Contact

 

05/21/2008 Mid-C Study Plan (v: 1)   

Mid-C_Study Plan.pdf   download>
Description: Mid-C Study Plan
Type: Document (pdf)
Status: DRAFT
Contact

 

05/21/2008 Northern Mid C Agenda (5.21.08) (v: 1)   

Agenda052108.pdf   download>
Description: Agenda
Type: Agenda
Status: FINAL

 

05/07/2008 Board Agenda (05.21.08) (v: 1)   

BoardAgenda(05.21.08).pdf   download>
Description: Board Agenda (05.21.08)
Type: Agenda
Status: FINAL
Contact

 

05/07/2008 Board Notice (05.21.08) (v: 1)   

BoardNotice(05.21.08).pdf   download>
Description: Board Notice (05.21.08)
Type: Notice
Status: FINAL
Contact

 

05/06/2008 Outage Workshop Agenda 5.12.08 (v: 2)   

5.12.08 agenda1.pdf   download>
Description: Outage Workshop Agenda
Type: Agenda
Status: FINAL
Contact

 

04/30/2008 Forum Agenda (5.5.08) (v: 1)   

ForumCallAgenda(05.06.08).pdf   download>
Description: Forum Call Agenda for May 5, 2008
Type: Agenda
Status: FINAL

 

04/30/2008 Forum Call Notice (05.06.08) (v: 1)   

ForumCallNotice(05.06.08).pdf   download>
Description: Forum Call Notice for May 6, 2008
Type: Notice
Status: FINAL
Contact

 

04/29/2008 NOS Future Needs (04.30.08) (v: 1)   

OS FutureNeeds(04.30.2008).pdf   download>
Description: NOS Future Needs(04.30.08) - BPA report
Type: Report
Status: FINAL
Contact

 

04/29/2008 BPA WOCS Status (4.30.08) (v: 1)   

BPA WOCS STATUS (4.30.08).pdf   download>
Description: BPA West Of Cascades South Status Report
Type: Report
Status: FINAL
Contact

 

04/29/2008 AttendanceSheet(04.16.08) (v: 1)   

AttendanceSheet(04.16.08).pdf   download>
Description: Attendance Sheet
Type: Attendence Sheets
Status: FINAL
Contact

 

04/28/2008 Study Plans for Sensitivity Studies (v: 1)   

SensitivityStudyPlans.pdf   download>
Description: Study Plans for Sensitivity Studies
Type: Document (pdf)
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance