Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



3061 - 3080 out of 3250.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163  

01/15/2008 PlanningPresentation(01.16.08) (v: 1)   

...ningPresentation(01.16.08).pdf   download>
Description: Planning Presentation for Jan. 16, 2008 Board of Directors' Meeting (01.16.08).
Type: Presentation
Status: FINAL
Contact

 

01/14/2008 DSRFAPresentation(01.16.08) (v: Final)   

SRFAPresentation(01.16.08).pdf   download>
Description: DSRFA Presentation for January 2008 Board Meeting
Type: Presentation
Status: FINAL
Contact

 

01/11/2008 VisibilityReport(01.01.08). (v: 1)   

VisibilityReport(01.01.08).pdf   download>
Description: First Visibility Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 OutageCoordReport(01.10.08). (v: 1)   

tageCoordReport( 01.10.08).pdf   download>
Description: First draft Outage Coordination Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 RedispatchReport(01.01.08). (v: 1)   

RedispatchReport(01.01.08).pdf   download>
Description: First Redispatch Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 ADIreport(01.01.08). (v: 1)   

ADIreport(01.01.08).pdf   download>
Description: Draft ADI report
Type: Report
Status: DRAFT
Contact

 

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact

 

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact

 

01/10/2008 Board Agenda (01.16.08) (v: 1)   

BdMtgAgenda(01.16.08).pdf   download>
Description: Board Meeting Agenda for January 16, 2008
Type: Agenda
Status: DRAFT

 

01/10/2008 Board Meeting Notice(01.16.08) (v: 1)   

BdMtgNotice(01.16.08).pdf   download>
Description: Meeting Notice
Type: Notice
Status: FINAL
Contact

 

01/08/2008 WECC Coordinated Planning and Technical Studies(Final) (v: 1)   

...d Technical Studies(Final).pdf   download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact

 

01/08/2008 Combined Wind Projects - Draft (v: 1)   

combinedwindprojects.pdf   download>
Description: Wind projects, construction, pending, operating
Type: Document (pdf)
Status: DRAFT
Contact

 

01/08/2008 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.doc   download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact

 

01/08/2008 System Assessment Study Plan (v.4) 12-12 edits (v: 4)   

...udy Plan (v.4) 12-12 edits.doc   download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact

 

01/08/2008 Draft Planning Agenda (1.09.08) (v: 1)   

... Plan Group Agenda 1-09-08.doc   download>
Description: Draft Planning Agenda (1.09.08)
Type: Agenda
Status: FINAL

 

01/04/2008 PSAST Agenda (01.10.08) (v: draft)   

11008_Draft_PSAST_Agenda.pdf   download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact

 

12/19/2007 State Agencies Protocol (v: final)   

State Protocol (12.19.07).pdf   download>
Description: Protocol to achieve collaborative involvement of state agencies in CG's planning and policy matters
Type: Protocol
Status: FINAL
Contact

 

08/15/2007 CGTribalProtocol (v: final)   

CGTribalProtocol.pdf   download>
Description: Protocol for coordination of information with Indian Tribes
Type: Protocol
Status: FINAL
Contact

 

08/15/2007 Oregon State Protocol (v: final)   

CGOregonProtocol.pdf   download>
Description: Oregon State Protocol
Type: Protocol
Status: FINAL
Contact

 

01/17/2008 2018 Extra Heavy Winter PowerWorld Version 12 Case (v: 4)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance