Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

3421 - 3440 out of 3607.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181  

01/11/2008 RedispatchReport(01.01.08). (v: 1)   

RedispatchReport(01.01.08).pdf   download>
Description: First Redispatch Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 ADIreport(01.01.08). (v: 1)   

ADIreport(01.01.08).pdf   download>
Description: Draft ADI report
Type: Report
Status: DRAFT
Contact

 

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact

 

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact

 

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact

 

01/10/2008 Board Agenda (01.16.08) (v: 1)   

BdMtgAgenda(01.16.08).pdf   download>
Description: Board Meeting Agenda for January 16, 2008
Type: Agenda
Status: DRAFT

 

01/10/2008 Board Meeting Notice(01.16.08) (v: 1)   

BdMtgNotice(01.16.08).pdf   download>
Description: Meeting Notice
Type: Notice
Status: FINAL
Contact

 

01/08/2008 WECC Coordinated Planning and Technical Studies(Final) (v: 1)   

...d Technical Studies(Final).pdf   download>
Description: WECC Coordinated Plan and Technical Studies
Type: Report
Status: FINAL
Contact

 

01/08/2008 Combined Wind Projects - Draft (v: 1)   

combinedwindprojects.pdf   download>
Description: Wind projects, construction, pending, operating
Type: Document (pdf)
Status: DRAFT
Contact

 

01/08/2008 Upcoming ColumbiaGrid Studies (v: 1)   

...oming ColumbiaGrid Studies.doc   download>
Description: Upcoming ColumbiaGrid Studies
Type: Report
Status: DRAFT
Contact

 

01/08/2008 System Assessment Study Plan (v.4) 12-12 edits (v: 4)   

...udy Plan (v.4) 12-12 edits.doc   download>
Description: System Assessment Study Plan
Type: Report
Status: DRAFT
Contact

 

01/08/2008 Draft Planning Agenda (1.09.08) (v: 1)   

... Plan Group Agenda 1-09-08.doc   download>
Description: Draft Planning Agenda (1.09.08)
Type: Agenda
Status: FINAL

 

01/04/2008 PSAST Agenda (01.10.08) (v: draft)   

11008_Draft_PSAST_Agenda.pdf   download>
Description: Draft PSAST Agenda
Type: Agenda
Status: DRAFT
Contact

 

12/19/2007 State Agencies Protocol (v: final)   

State Protocol (12.19.07).pdf   download>
Description: Protocol to achieve collaborative involvement of state agencies in CG's planning and policy matters
Type: Protocol
Status: FINAL
Contact

 

08/15/2007 CGTribalProtocol (v: final)   

CGTribalProtocol.pdf   download>
Description: Protocol for coordination of information with Indian Tribes
Type: Protocol
Status: FINAL
Contact

 

08/15/2007 Oregon State Protocol (v: final)   

CGOregonProtocol.pdf   download>
Description: Oregon State Protocol
Type: Protocol
Status: FINAL
Contact

 

01/17/2008 2018 Extra Heavy Winter PowerWorld Version 12 Case (v: 4)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact

 

01/24/2008 2018 Extra Heavy Winter PTI Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact

 

01/24/2008 2018 Extra Heavy Winter GE Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case. This file is a solved .sav file.
Type: Base Case
Status: DRAFT
Contact

 

01/17/2008 2018 Heavy Summer PowerWorld Version 12 Case (v: 6)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance