Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

3421 - 3440 out of 3621.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182  

02/01/2008 I-5 Corridor Project Regional Planning Compliance Report (v: sent)   

request access >  login >
Description: I-5 Corridor Project Regional Planning Compliance Report to WECC (1.31.08)
Type: Report
Status: FINAL

 

01/30/2008 Forum Notes (01.08.08) (v: 1)   

ForumNotes(01.08.08).pdf   download>
Description: Notes from Forum Conference Call, January 8, 2008
Type: Minutes
Status: FINAL
Contact

 

01/28/2008 Draft Need Statement-Outline for Olympia Peninsula (v: Draft)   

...tatement Olympia Peninsula.pdf   download>
Description: Draft Need Statement Outline for the Olympia Peninsula
Type:
Status: DRAFT
Contact

 

01/28/2008 Draft Planning Agenda (1.30.08) (v: 1)   

... Plan Group Agenda 1-30-08.pdf   download>
Description: Draft Planning Agenda (1.30.08)
Type: Agenda
Status: FINAL

 

01/17/2008 Board Meeting Minutes(12.19.07) (v: final)   

BdMtgMinutes(12.19.07).pdf   download>
Description: Board Meeting Minutes
Type: Minutes
Status: FINAL
Contact

 

01/16/2008 AttendanceSheet(01.16.08) (v: 1 )   

Attendence(01.16.08).pdf   download>
Type: Attendence Sheets
Status: FINAL
Contact

 

01/23/2008 Reliability Agenda (02.01.08) (v: 1)   

RelSmGrpAgenda (02 01 08).pdf   download>
Description: Reliability Small Group Meeting Agenda for Feb. 1, 2008
Type: Agenda
Status: FINAL

 

01/23/2008 1-5 Draft Report - Doc version (v: draft)   

1-5 rptdraftdoc.doc   download>
Description: 1-5 Draft Report without attachments - word document version for comment
Type: Report
Status: DRAFT
Contact

 

11/14/2007 AttendanceSheet(11.14.07) (v: 1)   

...dAttendanceLlist(11.14.07).pdf   download>
Description: Attendance
Type: Attendence Sheets
Status: FINAL
Contact

 

01/15/2008 PlanningPresentation(01.16.08) (v: 1)   

...ningPresentation(01.16.08).pdf   download>
Description: Planning Presentation for Jan. 16, 2008 Board of Directors' Meeting (01.16.08).
Type: Presentation
Status: FINAL
Contact

 

01/15/2008 CG 2018 HW Unsolved Contingencies by Area (v: 1)   

request access >  login >
Description: This spreadsheet contains a list of all unsolved contingencies for the CG 2018 HW case. These contingencies are listed on separate tabs for each area.
Type: Spreadsheet
Status: DRAFT
Contact

 

01/14/2008 DSRFAPresentation(01.16.08) (v: Final)   

SRFAPresentation(01.16.08).pdf   download>
Description: DSRFA Presentation for January 2008 Board Meeting
Type: Presentation
Status: FINAL
Contact

 

01/11/2008 VisibilityReport(01.01.08). (v: 1)   

VisibilityReport(01.01.08).pdf   download>
Description: First Visibility Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 OutageCoordReport(01.10.08). (v: 1)   

tageCoordReport( 01.10.08).pdf   download>
Description: First draft Outage Coordination Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 RedispatchReport(01.01.08). (v: 1)   

RedispatchReport(01.01.08).pdf   download>
Description: First Redispatch Report for 2008
Type: Report
Status: DRAFT
Contact

 

01/11/2008 ADIreport(01.01.08). (v: 1)   

ADIreport(01.01.08).pdf   download>
Description: Draft ADI report
Type: Report
Status: DRAFT
Contact

 

02/13/2008 CG 2018 EHW Contingency Results (v: (4))   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 EHW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact

 

04/24/2008 500 kV System PowerWorld OneLine (v: 2)   

request access >  login >
Description: PowerWorld version 13 oneline diagram (.pwd). This diagram was developed by BPA, and minor adjustments were made for compatibility with the ColumbiaGrid planning cases.
Type: Map
Status: DRAFT
Contact

 

01/11/2008 CG 2018 EHW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies
Type: Base Case
Status: DRAFT
Contact

 

01/10/2008 Board Agenda (01.16.08) (v: 1)   

BdMtgAgenda(01.16.08).pdf   download>
Description: Board Meeting Agenda for January 16, 2008
Type: Agenda
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance