Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

3461 - 3480 out of 3621.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182  

02/01/2008 2018 Heavy Summer PowerWorld Case (v: 9)   

request access >  login >
Description: ColumbiaGrid 2018 Heavy Summer Planning Case. Started from the WECC 15hs1sa base case.
Type: Base Case
Status: DRAFT
Contact

 

01/24/2008 2018 Extra Heavy Winter PowerWorld Case (v: 5)   

request access >  login >
Description: 2018 Extra Heavy Winter Planning Case. Developed from WECC 17hw1a case.
Type: Base Case
Status: DRAFT
Contact

 

12/21/2007 CG 2018 HW with Contingencies (v: 1)   

request access >  login >
Description: Zip file containing PowerWorld 2018 Heavy Winter version 13 case, with contingencies.
Type: Base Case
Status: DRAFT
Contact

 

12/31/2007 WOMGIP Regional Planning Report - Letter to WECC (v: 2)   

...rt Cover Letter (12.31.07).pdf   download>
Description: WOMGIP Regional Planning Report - Letter to WECC -
Type:
Status: FINAL
Contact

 

02/08/2008 CG 2018 HW Contingencies (v: 9)   

request access >  login >
Description: This spreadsheet contains all violations from N-1 and common mode outages run against the CG 2018 HW PowerWorld case. Each utility is expected to review these violations and provide comments.
Type: Spreadsheet
Status: DRAFT
Contact

 

12/18/2007 DRAFT WOM Regional Planning Review Group Report to WECC (12.18.07) (v: draft)   

..._121807 to RPRG for review.doc   download>
Description: DRAFT WOM Regional Planning Review Group Report to WECC
Type: Report
Status: DRAFT
Contact

 

12/18/2007 Sea Breeze Slide Presentation (12.12.07) (v: 1)   

...r CG Biennial Planning Mtg.pdf   download>
Description: Sea Breeze Slide Presentation for Biennial Planning Meeting (12.12.07)
Type: Presentation
Status: FINAL
Contact

 

12/18/2007 FundingAgreementIssues(12.19.07) (v: 1)   

...greement Issues (12.19.07).pdf   download>
Description: Funding Agreement Issues (12.19.07)
Type: Report
Status: FINAL
Contact

 

12/18/2007 Board Agenda (12.19.07) (v: final)   

oard Mtg Agenda (12.19.07).pdf   download>
Description: Board Meeting Agenda (12.19.07)
Type: Agenda
Status: FINAL

 

12/17/2007 Treasurer'sReport(12.19.07) (v: 1)   

...asurer's Report (12.19.07).pdf   download>
Description: Treasurer's Report
Type: Financial
Status: FINAL
Contact

 

12/19/2007 Budgets 2008-2009(12.19.07) (v: final)   

dgets 2008-2009 (12.19.07).pdf   download>
Description: 2008-2009 Budgets
Type: Financial
Status: FINAL
Contact

 

01/14/2008 Financial & Accounting Policies & Procedures(12.19.07) (v: final)   

... Pol Proc-Internl Controls.pdf   download>
Description: System of Internal Controls and Financial and Accounting Policies and Procedures
Type: Financial
Status: FINAL
Contact

 

12/17/2007 I-5 Corridor Reinforcement Presentation (v: 121707)   

...ia_Grid_I-5_Corridor_Dec17.pdf   download>
Description: 1-5 Corridor Reinforcement Regional Review - presentation by BPA
Type: Presentation
Status: FINAL

 

01/17/2008 PEFA First Amendment (v: signed)   

PEFA Amendment(12.19.07).pdf   download>
Description: Amendment to the PEFA
Type: Functional Agreement
Status: FINAL
Contact

 

12/14/2007 Redispatch Report (v: draft)   

...atchlReport forCG_12_14_07.pdf   download>
Description: Draft Report on Redispatch
Type: Report
Status: DRAFT
Contact

 

12/14/2007 Visibility- Interim Report (v: 2)   

12.18.07 Visibility 121407.pdf   download>
Description: Interim Report - Visibility Preliminary Findaings
Type: Report
Status: DRAFT
Contact

 

12/14/2007 Outage Coordination Draft Report (12 13 07) (v: 1)   

...tion Draft Report 12 13 07.pdf   download>
Description: Draft Report on Outage Coordination
Type: Report
Status: DRAFT
Contact

 

12/14/2007 Draft ADI Report (12.13.07) (v: 1)   

2.18.07 ADIreport_12_13_07.pdf   download>
Description: Draft ADI Report
Type: Report
Status: DRAFT
Contact

 

12/14/2007 Reliability Agenda (12.18.07) (v: 1)   

12.18.07 Agenda.pdf   download>
Description: Agenda for December 18, 2007 meeting
Type: Agenda
Status: DRAFT

 

12/14/2007 BoardMtgNotice(12.19.07) (v: 1)   

Board Notice (12.19.07).pdf   download>
Description: Board Notice (12.19.07)
Type: Notice
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance