Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

841 - 860 out of 3621.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182  

12/08/2014 Treasurer's Report (10.31.14) (v: 1)   

Treasurer'sReport(103114).pdf   download>
Description: Treasurer's Report (10.31.14)
Type: Report
Status: FINAL
Contact

 

12/08/2014 Board Agenda (12.10.14) (v: 1)   

BoardAgenda(12.10.14).pdf   download>
Description: Board Meeting Agenda (12.10.14)
Type: Agenda
Status: DRAFT
Contact

 

12/08/2014 2025HS1_Area40InitialSubmittal_PWB (v: 1)   

request access >  login >
Description: 2025HS1_Area40InitialSubmittal_PWB
Type: Base Case
Status: DRAFT
Contact

 

12/08/2014 2025HS1_Area40InitialSubmittal_EPC (v: 1)   

request access >  login >
Description: 2025HS1_Area40InitialSubmittal_EPC
Type: Base Case
Status: DRAFT
Contact

 

12/08/2014 Master Change File_25HS1_InitialSubmittal (v: 1)   

request access >  login >
Description: Master Change File_25HS1_InitialSubmittal
Type: Base Case
Status: DRAFT
Contact

 

12/08/2014 Special Member Meeting Minutes (11.7.14) (v: 1)   

...berMeetingMinutes(11.7.14).pdf   download>
Description: Special Member Meeting Minutes (11.7.14)
Type:
Status: FINAL
Contact

 

12/05/2014 Biannual Member Meeting Minutes (10.15.14) (v: 1)   

...mberMeetingMinutes(101514).pdf   download>
Description: Biannual Member Meeting Minutes (10.15.14)
Type: Minutes
Status: FINAL
Contact

 

12/04/2014 Figure E-1 Slide (v: 1)   

E1(2).pdf   download>
Description: Figure E-1 Slide
Type: Presentation
Status: FINAL
Contact

 

12/04/2014 EPS Presentation (12.4.14) (v: 1)   

EPS_Presentation(12.4.14).pdf   download>
Description: EPS Presentation (12.4.14)
Type: Presentation
Status: FINAL
Contact

 

12/03/2014 2015 System Assessment Base Cases Slide (v: 1)   

...5SystemAssessmentBaseCases.pdf   download>
Description: 2015 System Assessment Base Cases Slide
Type: Presentation
Status: FINAL
Contact

 

12/03/2014 Outage Results Analysis (26mb zip file) (v: 1)   

request access >  login >
Description: Outage Results Analysis
Type: PowerWorld Auxiliary File
Status: FINAL
Contact

 

12/02/2014 2014 System Assessment Results Zone Gen Results (v: 1)   

request access >  login >
Description: 2014 System Assessment Results Zone Gen Results
Type: Spreadsheet
Status: DRAFT
Contact

 

12/02/2014 System Assessment Contingency Methodology Draft (v: 1)   

...ngencyMethodology_Draft_r1.pdf   download>
Description: System Assessment Contingency Methodology Draft;
Type: Document (pdf)
Status: DRAFT
Contact

 

12/02/2014 System Assessment Data Preparation Contingency Processing (v: 1)   

...ationContingencyProcessing.pdf   download>
Description: System Assessment Data Preparation Contingency Processing
Type: Document (pdf)
Status: DRAFT
Contact

 

02/23/2015 Final 2015 Biennial Transmission Expansion Plan (10MB) (v: 3)   

2015BPFinalweb.pdf   download>
Description: 2015 Biennial Transmission Expansion Plan Report
Type: Report
Status: FINAL
Contact

 

11/26/2014 Draft 2015 Biennial Plan Graphics, Tables & Attachment A (10MB) (v: 1)   

attachmentsBP2015.pdf   download>
Description: Draft 2015 Biennial Plan Graphics, Tables
Type: Document (pdf)
Status: DRAFT
Contact

 

11/26/2014 Draft 2015 Biennial Plan Attachment B (v: 1)   

...nsmissionExpansionProjects.pdf   download>
Description: Draft 2015 Biennial Plan Attachment B
Type: Document (pdf)
Status: DRAFT
Contact

 

11/26/2014 Board Meeting Notice (12.10.14) (v: 1)   

ardMeetingNotice(12.10.14).pdf   download>
Description: Board Meeting Notice (12.10.14)
Type: Notice
Status: FINAL
Contact

 

11/21/2014 W141119c_Interface Flow Backcast (65MB) (v: 1)   

...c_Interface_Flow_Backcast.xlsx   download>
Description: W141119c_Interface Flow Backcast (65MB)
Type: Spreadsheet
Status: DRAFT
Contact

 

11/20/2014 16HW3-OP_ReferenceCase_PWB (v: 1)   

request access >  login >
Description: 16HW3-OP_ReferenceCase_PWB
Type: Base Case
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance