Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

861 - 880 out of 3226.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162  

11/12/2014 2025HS1_DraftPreRun_PWB (v: 1)   

request access >  login >
Description: 2025HS1_DraftPreRun_PWB
Type: Base Case
Status: DRAFT
Contact

 

11/12/2014 2025HS1_DraftPreRun_EPC (v: 1)   

request access >  login >
Description: 2025HS1_DraftPreRun_EPC
Type: Base Case
Status: DRAFT
Contact

 

11/12/2014 Master Change File_25HS1_InitialReview (v: 1)   

request access >  login >
Description: Master Change File_25HS1_InitialReview
Type: Base Case
Status: DRAFT
Contact

 

11/12/2014 25HS1 Draft PreRun Case Summary (v: 1)   

request access >  login >
Description: 25HS1 Draft PreRun Case Summary
Type: Base Case
Status: DRAFT
Contact

 

11/07/2014 Draft First Amended and Restated Order 1000 Functional Agreement CLEAN (11.5.14 version) (v: 2)   

... Agreement CLEAN (11-6-14).pdf   download>
Description: Draft First Amended and Restated Order 1000 Functional Agreement CLEAN (11.5.14 version)
Type: Document (pdf)
Status: DRAFT
Contact

 

11/05/2014 TPL Draft Agenda (11.6.14) (v: 1)   

...ting_11_6_Agenda_Draft_v1.docx   download>
Description: TPL Draft Agenda (11.6.14)
Type: Agenda
Status: DRAFT
Contact

 

11/05/2014 CG System Assessment Data Preparation Contingency Processing Process Draft (v: 1)   

...cyProcessingProcess_Draft.docx   download>
Description: CG System Assessment Data Preparation Contingency Processing Process Draft
Type: Report
Status: DRAFT
Contact

 

11/05/2014 Transmission System Planning Performance WECC Regional Criterion TPL-001-WECC-CRT-3 (v: 1)   

...-CRT-3 - Posting 1 - Clean.doc   download>
Description: Transmission System Planning Performance WECC Regional Criterion TPL-001-WECC-CRT-3
Type: Report
Status: DRAFT

 

11/05/2014 CG System Assessment Contingency Methodology Draft (v: 1)   

...tingencyMethodology_Draft.docx   download>
Description: CG System Assessment Contingency Methodology Draft
Type: Report
Status: DRAFT
Contact

 

11/04/2014 2025hw1_Area40InitialSubmittal_PWB (v: 1)   

request access >  login >
Description: 2025hw1_Area40InitialSubmittal_PWB
Type: Base Case
Status: DRAFT
Contact

 

11/04/2014 2025hw1_Area40InitialSubmittal_EPC (v: 1)   

request access >  login >
Description: 2025hw1_Area40InitialSubmittal_EPC
Type: Base Case
Status: DRAFT
Contact

 

11/04/2014 Master Change File_25HW1_InitialSubmittal (v: 1)   

request access >  login >
Description: Master Change File_25HW1_InitialSubmittal
Type: Base Case
Status: DRAFT
Contact

 

10/29/2014 WECC 2020 HS 2 Planning Case (v: 1)   

request access >  login >
Description: WECC 2020 HS 2 Planning Case
Type: PowerWorld Auxiliary File
Status: DRAFT

 

10/27/2014 Special Board Meeting Agenda (11.7.14) (v: 1)   

...oardMeetingAgenda(11.7.14).pdf   download>
Description: Special Board Meeting Agenda (11.7.14)
Type: Agenda
Status: DRAFT
Contact

 

10/27/2014 Special Member Meeting Agenda (11.7.14) (v: 1)   

...mberMeetingAgenda(11.7.14).pdf   download>
Description: Special Member Meeting Agenda (11.7.14)
Type: Agenda
Status: DRAFT
Contact

 

10/27/2014 Special Member Meeting and Special Board Meeting Notice (11.7.14) (v: 1)   

...tingandBODMeeting(11.7.14).pdf   download>
Description: Special Member Meeting and Special Board Meeting Notice (11.7.14)
Type: Notice
Status: FINAL
Contact

 

10/27/2014 Central Ferry - LoMo Draft Agenda (10.28.14) (v: 1)   

...rry-Lomo_Agenda(10-28-14).docx   download>
Description: Central Ferry - LoMo Draft Agenda (10.28.14)
Type: Agenda
Status: DRAFT
Contact

 

10/23/2014 Draft Planning Agenda (12.4.14) (v: 1)   

...ftPlanningAgenda(12-4-14).docx   download>
Description: Draft Planning Agenda (12.4.14)
Type: Agenda
Status: DRAFT
Contact

 

10/23/2014 PDCI_Phase1_Kick-Off (v: 1)   

PDCI_Phase1_Kick-Off.pptx   download>
Description: PDCI_Phase1_Kick-Off
Type: Presentation
Status: DRAFT
Contact

 

10/21/2014 101714 WOMR PRG Results (zip file) (v: 1)   

request access >  login >
Description: 101714 WOMR PRG Results (zip file)
Type: PowerWorld Auxiliary File
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance