Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1001 - 1020 out of 3156.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

01/16/2014 May 30 2013 Event Presentation (Stephanie Lu) (v: 1)   

...Presentation_SGL 2014-1-16.pdf   download>
Description: May 30 2013 Event Presentation (Stephanie Lu)
Type: Presentation
Status: FINAL

 

01/16/2014 Cluster Study Extension (v: 1)   

Cluster Study Extension.pdf   download>
Description: Cluster Study Extension
Type: Presentation
Status: FINAL

 

01/16/2014 2013 Cluster Study Status (v: 1)   

...tus ColumbiaGrid 011614 v1.pdf   download>
Description: 2013 Cluster Study Status
Type: Presentation
Status: FINAL

 

01/16/2014 Reduced Conservation Presentation (v: 1)   

...tion 1_16 Planning Meeting.pdf   download>
Description: Reduced Conservation Presentation
Type: Presentation
Status: FINAL
Contact

 

01/16/2014 2014 System Assessment Basecases Presentation (Jonathan) (v: 1)   

...SystemAssessment_Basecases.pdf   download>
Description: 2014 System Assessment Basecases Presentation (Jonathan)
Type: Presentation
Status: FINAL
Contact

 

01/16/2014 Transmission Projects SA 2014 (v: 1)   

TxProjSA2014draft.xlsx   download>
Description: Transmission Projects SA 2014
Type: Spreadsheet
Status: DRAFT

 

01/15/2014 Avista System Planning Assessment (v: 2013)   

...lanning_Assessment_-_Rev_0.pdf   download>
Description: Avista System Planning Assessment 2013 Local Planning Report Published December 20, 2013
Type: Report
Status: FINAL

 

01/15/2014 Avista System Planning Assessment Appendices (v: 2013)   

..._Assessment_-_Appendix_B-D.pdf   download>
Description: Avista System Planning Assessment 2013 Local Planning Report Published December 20, 2013
Type: Report
Status: FINAL

 

01/15/2014 Interface Flow 1220b v3 TierWheel (LARGE 44mb file) (v: 1)   

...e_Flow_1220b_v3_TierWheel.xlsx   download>
Description: Interface Flow 1220b v3 TierWheel (LARGE 44mb file)
Type: Spreadsheet
Status: DRAFT
Contact

 

01/13/2014 TPL1-4 Presentation (1.15.14) (v: 1)   

TPL1_4Presentation.pdf   download>
Description: TPL1-4 Presentation (1.15.14)
Type: Presentation
Status: DRAFT
Contact

 

01/13/2014 TPL1-4 (v: 1)   

TPL1_4.pdf   download>
Description: TPL1-4
Type: Document (pdf)
Status: DRAFT
Contact

 

01/13/2014 TPL Table (v: 1)   

TPL_Table.pdf   download>
Description: TPL Table
Type: Document (pdf)
Status: FINAL
Contact

 

01/13/2014 Economic Planning Study Agenda (1.13.14) (v: 1)   

DraftEPSAgenda(1-13-14).pdf   download>
Description: Economic Planning Study Agenda (1.13.14)
Type: Agenda
Status: DRAFT
Contact

 

01/13/2014 Economic Planning Study (v: 1)   

EPS_12_09_v2.pdf   download>
Description: Economic Planning Study
Type: Presentation
Status: FINAL
Contact

 

01/10/2014 15HW3-OP DraftPreRun Case Summary (v: 1)   

confidentiality agreement required >
Description: 15HW3-OP DraftPreRun Case Summary
Type: Base Case
Status: DRAFT
Contact

 

01/09/2014 24hs1s_Area40FinalSubmittal_PWB (v: 1)   

request access >  login >
Description: 24hs1s_Area40FinalSubmittal_PWB
Type: Base Case
Status: DRAFT
Contact

 

01/09/2014 24hs1s_Area40FinalSubmittal_EPC (v: 1)   

request access >  login >
Description: 24hs1s_Area40FinalSubmittal_EPC
Type: Base Case
Status: DRAFT
Contact

 

01/09/2014 Master Change File_24HS1-S_ReviewCase (v: 1)   

request access >  login >
Description: Master Change File_24HS1-S_ReviewCase
Type: Base Case
Status: DRAFT
Contact

 

01/08/2014 WOMR Phase 2B Aux Files (v: 1)   

request access >  login >
Description: WOMR Phase 2B Materials--Aux Files. Contingency and RAS definition aux file and Interface/Injection Group definition aux file.
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

12/23/2013 Order 1000 Functional Agreement 12.17.13 (v: 1)   

...ctional Agreement 12-17-13.pdf   download>
Description: Order 1000 Functional Agreement 12.17.13
Type: Functional Agreement
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Avista Corporation      Project: ColumbiaGrid     
Avista Corporation

"In ColumbiaGrid, we now have the ability to resolve the three fundamental transmission questions: What transmission facilities should be built? Who should build them? Who should pay for them? With ColumbiaGrid's independent staff and process to resolve disputes, we can answer these questions effectively and in a timely fashion to facilitate our region's new resource development needs."
~~ Jeff Schlect, Manager, Transmission Services, Avista