Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1261 - 1280 out of 3149.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

03/12/2013 Action Items from 3.7.13 (v: 1)   

ActionItemsfrom3-7-13CGPM.pdf   download>
Description: Action Items from 3.7.13
Type: Minutes
Status: DRAFT
Contact

 

03/06/2013 Ten Year Plan Committed Projects SA 2013 (v: 1)   

...edProjectsSA2013_Comments.xlsx   download>
Description: Ten Year Plan Committed Projects SA 2013
Type: Spreadsheet
Status: DRAFT
Contact

 

03/06/2013 System Assessment Assumptions (v: 1)   

ystemAssessmentAssumptions.pdf   download>
Description: System Assessment Assumptions
Type: Presentation
Status: DRAFT
Contact

 

03/04/2013 Summary of Feb 06 Stakeholder Comments-1 (03.11.13) (v: 1)   

...fFeb06StakeholderComments1.pdf   download>
Description: Summary of Feb 06 Stakeholder Comments-1 (03.11.13)
Type: Document (pdf)
Status: FINAL
Contact

 

03/04/2013 Proposed Interregional Coordination Approach Summary (03.11.13) (v: 1)   

...oordinationApproachSummary.pdf   download>
Description: Proposed Interregional Coordination Approach Summary
Type: Document (pdf)
Status: FINAL
Contact

 

03/04/2013 Common Interregional Tariff Language for Final TP Approval (03.11.13) (v: 1)   

...LanguageforFinalTPApproval.pdf   download>
Description: Common Interregional Tariff Language for Final TP Approval
Type: Document (pdf)
Status: FINAL
Contact

 

03/04/2013 Interregional O1K Stakeholder Call Notice (03.11.13) (v: 1)   

...alO1K takeholderCallNotice.pdf   download>
Description: Interregional O1K Stakeholder Call Notice (03.11.13)
Type: Notice
Status: FINAL
Contact

 

03/04/2013 22lsp1bse_PWB (v: 1)   

request access >  login >
Description: 22lsp1bse_PWB
Type: Base Case
Status: DRAFT
Contact

 

03/04/2013 22lsp1bse_EPC (v: 1)   

request access >  login >
Description: 22lsp1bse_EPC
Type: Base Case
Status: DRAFT
Contact

 

04/18/2013 NMCJOST Study Iteration Version 16 (v: 4_18)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

04/29/2013 NMCJOST Study Iteration (v: 4_29)   

request access >  login >
Description: Zip file containing PowerWorld cases and contingency results
Type: Base Case
Status: DRAFT
Contact

 

05/02/2013 2013 System Assessment Contingency Results (v: 4_23_2013)   

request access >  login >
Description: Contingency results summary spreadsheet for the 2013 System Assessment
Type: Spreadsheet
Status: DRAFT
Contact

 

02/28/2013 Draft Planning Agenda (3.7.13) (v: 1)   

aftPlanningAgenda(3-7-13).docx   download>
Description: Draft Planning Agenda (3.7.13)
Type: Agenda
Status: DRAFT
Contact

 

02/28/2013 2012 Annual Report (v: 1)   

AnnualReport2012.pdf   download>
Description: 2012 Annual Report
Type: Financial
Status: FINAL
Contact

 

02/22/2013 Treasurer's Report (2.20.13) (v: 1)   

Treasurer'sReport(2.20.13).pdf   download>
Description: Treasurer's Report (2.20.13)
Type: Report
Status: DRAFT
Contact

 

02/21/2013 Biannual Member Meeting Minutes (10.17.12) (v: 1)   

...erMeetingMinutes(10.17.12).pdf   download>
Description: Biannual Member Meeting Minutes (10.17.12)
Type: Minutes
Status: DRAFT
Contact

 

02/22/2013 PSAST Updated North to South Transmission Expansion Plan (v: 1)   

  risk of use agreement required >>
Description: PSAST Updated North to South Transmission Expansion Plan
Type: Report
Status: FINAL
Contact

 

02/21/2013 Gas-Electric I5 Gas Curtailment Study Fourth Draft (2.21.13) (v: 1)   

...udy-Fourth Draft_2-21-2013.doc   download>
Description: Gas-Electric I5 Gas Curtailment Study Fourth Draft (2.21.13)
Type: Report
Status: DRAFT
Contact

 

02/20/2013 Board Meeting Minutes (12.12.12) (v: 1)   

oDMinutes(12.12.12)Meeting.pdf   download>
Description: Board Meeting Minutes (12.12.12)
Type: Minutes
Status: DRAFT
Contact

 

02/19/2013 ColumbiaGrid Planning Presentation (2.20.13) (v: 1)   

...ionPlanning(2.20.13)-Final.pdf   download>
Description: ColumbiaGrid Planning Presentation (2.20.13)
Type: Presentation
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities