Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1461 - 1480 out of 3607.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181  

03/27/2013 Special Member Meeting Agenda (04.02.13 ) (v: 1)   

...-13 Special Meeting agenda.pdf   download>
Description: Special Member Meeting Agenda (04.02.13 )
Type: Agenda
Status: FINAL
Contact

 

03/27/2013 Special Member Meeting Notice(04.02.13) (v: 1)   

... Special Member Mtg notice.pdf   download>
Description: Special Member Meeting Notice(04.02.13)
Type: Notice
Status: FINAL
Contact

 

03/27/2013 I-5 Gas Curtailment Study Fifth Draft (3.21.13) (v: 1)   

...y-Fifth_Draft_3-21-2013[1].doc   download>
Description: I-5 Gas Curtailment Study Fifth Draft (3.21.13)
Type: Report
Status: DRAFT
Contact

 

03/26/2013 Risk-based Transmission Planning - Xcel Energy's Perspective (v: 1)   

...GridTransformationWorkshop.pdf   download>
Description: Risk-based Transmission Planning - Xcel Energy's Perspective
Type: Presentation
Status: FINAL

 

03/26/2013 Bridge to Post-contingency Mitigation Using Short Term Ratings (v: 1)   

... - SQN slide for Ian (2)R2.pdf   download>
Description: Bridge to Post-contingency Mitigation Using Short Term Ratings
Type: Presentation
Status: FINAL

 

03/26/2013 Transmission Grid Flexibility (v: 1)   

...nsmissionFlexibility_Final.pdf   download>
Description: Transmission Grid Flexibility
Type: Presentation
Status: FINAL

 

03/26/2013 Grid Transformation Workshop - By Damir Novosel (v: 1)   

...deling Portland March 2013.pdf   download>
Description: Grid Transformation Workshop - By Damir Novosel
Type: Presentation
Status: FINAL

 

03/26/2013 BPA Power Approach to Risk-Based Planning - by Steven B. Barton (v: 1)   

SteveBartonRisk_Planning.pdf   download>
Description: BPA Power Approach to Risk-Based Planning
Type: Presentation
Status: FINAL

 

03/26/2013 Probabilistic justification of planning, operating and control solutions - by Anatoliy Meklin (v: 1)   

...A-2013-A.Meklin-QT-March19.pdf   download>
Description: Probabilistic justification of planning, operating and control solutions - by Anatoliy Meklin
Type: Presentation
Status: FINAL

 

03/26/2013 Industry Experience with Risk-Based Planning (v: 1)   

...Based Planning_031813_CEM1.pdf   download>
Description: Industry Experience with Risk-Based Planning
Type: Presentation
Status: FINAL

 

03/26/2013 Planning for Operational Flexibility - by Gordon Dobson-Mack (v: 1)   

... BPA March 20 2013 (Final).pdf   download>
Description: Planning for Operational Flexibility - by Gordon Dobson-Mack
Type: Presentation
Status: FINAL

 

03/26/2013 Past and Present Probabilistic Planning Efforts in WECC (2) - by M. Papic, B. Mittelstadt & C. Matthews (v: 1)   

...c Planning in WECC 3-20-13.pdf   download>
Description: Past and Present Probabilistic Planning Efforts in WECC (2) - by M. Papic, B. Mittelstadt & C. Matthews
Type: Presentation
Status: FINAL

 

03/26/2013 Past and Present Probabilistic Planning Efforts in WECC - by M. Papic, B. Mittelstadt & C. Matthews (v: 1)   

...c Planning in WECC 2~15~13.pdf   download>
Description: Past and Present Probabilistic Planning Efforts in WECC - by M. Papic, B. Mittelstadt & C. Matthews
Type: Presentation
Status: FINAL

 

03/26/2013 Dealing with Modeling Uncertainty - by Dmitry Kosterev (v: 1)   

...id Transformation Workshop.pdf   download>
Description: Dealing with Modeling Uncertainty - by Dmitry Kosterev
Type: Presentation
Status: FINAL

 

03/26/2013 Strategy Impact Comparison Matrix (v: 1)   

...ound_MulticriteriaTradeoff.pdf   download>
Description: Strategy Impact Comparison Matrix
Type: Presentation
Status: FINAL

 

03/26/2013 Two Examples of Probabilistic Transmission Planning - by Bill Mittelstady, Chuck Matthews & Paul Ferron (v: 1)   

...ic Planning in BPA 3~12~13.pdf   download>
Description: Two Examples of Probabilistic Transmission Planning - by Bill Mittelstady, Chuck Matthews & Paul Ferron
Type: Presentation
Status: FINAL

 

03/26/2013 Probabilistic justification of planning, operating and control solutions - by Anatoliy Meklin (v: 1)   

...A-2013-A Meklin-QT-March19.pdf   download>
Description: Probabilistic justification of planning, operating and control solutions - by Anatoliy Meklin
Type: Presentation
Status: FINAL

 

03/26/2013 Transmission Metric (v: 1)   

...smission Metric discussion.pdf   download>
Description: Transmission Metric
Type: Presentation
Status: DRAFT

 

03/26/2013 Multi-period planning models under uncertainty - by James D. McCalley (v: 1)   

...20-2013FinalWithLastSlides.pdf   download>
Description: Multi-period planning models under uncertainty - by James D. McCalley
Type: Presentation
Status: DRAFT

 

03/26/2013 PJM Regional Transmission Planning (v: 1)   

...rid_Trasformation_Workshop.pdf   download>
Description: PJM Regional Transmission Planning
Type: Presentation
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance