Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1541 - 1560 out of 3185.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  


05/09/2012 18 HS2 Draft Prerun Case Case Summary (v: 2)   

request access >  login >
Description: 18 HS2 Draft Prerun Case Case Summary
Type: Spreadsheet
Status: DRAFT
Contact

 

05/08/2012 18 HS2 Master Change Files (v: 1)   

request access >  login >
Description: Change files to the 18 HS2 reference case
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

05/08/2012 22LSP1-TEP Initial Submittal Files (v: 1)   

request access >  login >
Description: 22LSP1-TEP Initial Submittal Files
Type: Base Case
Status: DRAFT
Contact

 

05/04/2012 North to South Study Summary (v: 1)   

request access >  login >
Description: North to South Study Summary
Type: Document (pdf)
Status: DRAFT
Contact

 

05/03/2012 PRC 023 CG Meeting (Avista 5.3.12) (v: 1)   

PRC_023_CG Meeting.pdf   download>
Description: PRC 023 CG Meeting (Avista 5.3.12)
Type: Presentation
Status: DRAFT

 

05/03/2012 Transient Stability CG Planning Meeting (5.3.12) (v: 1)   

...lity_CG_PlanningMtg03May12.pdf   download>
Description: Transient Stability CG Planning Meeting (5.3.12)
Type: Presentation
Status: DRAFT
Contact

 

05/03/2012 WECC Comprehensive Project Review Waiver (v: 1)   

...ensiveProjectReview Waiver.pdf   download>
Description: WECC Comprehensive Project Review Waiver
Type: Report
Status: DRAFT
Contact

 

05/03/2012 Quanta Technology General Capabilities CG 2012 (v: 1)   

...ralCapabilitiesCG2012Final.pdf   download>
Description: Quanta Technology General Capabilities CG 2012
Type: Presentation
Status: DRAFT

 

05/01/2012 Updated TTC and TCRM Results (v: 1)   

request access >  login >
Description: Updated TTC and TCRM Results
Type: Spreadsheet
Status: DRAFT
Contact

 

04/23/2012 BPA Phase III Intra-Hour February Report (v: 1)   

...Intra-Hour_February_Report.pdf   download>
Description: BPA Phase III Intra-Hour February Report
Type: Report
Status: FINAL

 

04/23/2012 BPA Phase_II_and_III_Intra-Hour_Report (v: 1)   

..._and_III_Intra-Hour_Report.pdf   download>
Description: BPA Phase_II_and_III_Intra-Hour_Report
Type: Report
Status: FINAL

 

04/23/2012 DSS Present entation ver 3 (04.23.12) (v: 3)   

... Present JI 20120423_ver 3.pdf   download>
Description: DSS Presention JI 20120423_ver 3
Type:
Status: FINAL

 

04/23/2012 I-TAP webExchange Initial Presentation (04.23.12) (v: 1)   

...tialPresentation(04.23.12).pdf   download>
Description: I-TAP webExchange Initial Presentation (04.23.12)
Type:
Status: FINAL

 

04/23/2012 DSS Presentation 20120423 ver2 (04.23.12) (v: 1)   

S_20120423_ver 2(04.23.12).pdf   download>
Description: DSS Presentation 20120423 ver2 (04.23.12)
Type: Report
Status: FINAL

 

04/23/2012 PSEI Hour BP 20100524 (v: 1)   

PSEI Hour BP 20100524.pdf   download>
Description: PSEI Hour BP 20100524
Type: Report
Status: FINAL

 

04/23/2012 PSE Within Hour TSR 20090526 (v: 1)   

E Within Hour TSR 20090526.pdf   download>
Description: PSE Within Hour TSR 20090526
Type: Report
Status: FINAL

 

04/23/2012 PSE Intra-Hour Schedule Submittal Timing Example (v: 1)   

...e Submittal Timing Example.pdf   download>
Description: PSE Intra-Hour Schedule Submittal Timing Example
Type: Report
Status: FINAL

 

04/23/2012 PGE Intra-hour Requests for Interchange.r1.1 (7-7-2011) (v: 1)   

..._Interchange_r1 1 7-7-2011.pdf   download>
Description: PGE Intra-hour Requests for Interchange.r1.1 (7-7-2011)
Type: Report
Status: FINAL

 

04/23/2012 PacifiCorp BP #48 Intra Hour (v: 1)   

cifiCorp BP #48 Intra Hour.pdf   download>
Description: PacifiCorp BP #48 Intra Hour
Type: Report
Status: FINAL

 

04/23/2012 IPC BP FINAL Section 25 Intra-hour Transmission Service Requests and Scheduling v0 07-05-11 (v: 1)   

...and_Scheduling_v0_07-05-11.pdf   download>
Description: IPC BP FINAL Section 25 Intra-hour Transmission Service Requests and Scheduling v0 07-05-11
Type: Report
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance