Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1601 - 1620 out of 3204.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161  

04/02/2012 Cross Cascades North Final Team Report (v: 02Apr12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

03/30/2012 PowerWorld Simulator Time Step Simulation Files (v: 30Mar12)   

request access >  login >
Type:
Status: DRAFT
Contact

 

03/30/2012 Final Draft Report For Approval (v: 30Mar12)   

  risk of use agreement required >>
Type: Report
Status: DRAFT
Contact

 

03/29/2012 Heavy Winter South - North 2100 MW Transfer Analysis (v: 1)   

request access >  login >
Description: Heavy Winter South - North 2100 MW Transfer Analysis
Type: Spreadsheet
Status: DRAFT
Contact

 

03/28/2012 Inductor Switching Excel (v: 1)   

request access >  login >
Description: Spreadsheet that estimates the number of times the series inductors need to be switched to optimal intertie capacity.
Type: Spreadsheet
Status: DRAFT
Contact

 

03/28/2012 Denny Phase 2 and 3 TCRM (v: 1)   

request access >  login >
Description: Denny Phase 2 and 3 TCRM
Type: Spreadsheet
Status: DRAFT
Contact

 

03/28/2012 Adjacent Circuit Review (v: 1)   

request access >  login >
Description: TCRM Analysis of Adjacent Circuits in the PSAST area
Type: Spreadsheet
Status: DRAFT
Contact

 

03/28/2012 PSAST Agenda (4.3.12) (v: 2)   

PSAST_April3_Agenda_r1.doc   download>
Description: PSAST Agenda (4.3.12)
Type: Agenda
Status: DRAFT
Contact

 

03/27/2012 Path 3 StoN Uprate 30Nov2011 PRG Meeting Notes (v: 1)   

...e30Nov2011PRGmeetingnotes.docx   download>
Description: Path 3 StoN Uprate 30Nov2011 PRG Meeting Notes
Type: Minutes
Status: DRAFT

 

03/27/2012 Path 3 Upgrade Phase 2 PRG Agenda (3.27.12) (v: 1)   

...radePhase2PRG27.3.12agenda.doc   download>
Description: Path 3 Upgrade Phase 2 PRG (3.27.12) Meeting Agenda
Type: Agenda
Status: DRAFT

 

03/26/2012 Powerworld Tools Presentation (v: Rolstad)   

...ay Never Have Known About.pptx   download>
Type: Presentation
Status: DRAFT

 

03/26/2012 Reading a GE case into Powerworld (v: Rolstad)   

eading a GE case into PWS.pptx   download>
Type: Presentation
Status: DRAFT

 

03/26/2012 Final Draft For Team Approval (v: 26Mar12)   

  risk of use agreement required >>
Type: Report
Status: DRAFT
Contact

 

03/26/2012 MOD029 White Paper 03.21.12 (v: 1)   

MOD029WhitePaper03.21.12.pdf   download>
Description: MOD029 White Paper 03.21.12
Type: Presentation
Status: FINAL

 

03/26/2012 MOD029 White Paper 03.21.12 (v: 1)   

MOD029WhitePaper03.21.12.pdf   download>
Description: MOD029 White Paper 03.21.12
Type: Report
Status: FINAL

 

03/26/2012 Draft SAR Form 3.21.12a (v: 1)   

DraftSARForm3.21.12a.pdf   download>
Description: Draft SAR Form 3.21.12a
Type: Document (pdf)
Status: FINAL

 

03/23/2012 ColumbiaGrid Flexible Capacity Discussion Concepts 032312 draft (v: 1)   

...ussionConcepts 032312draft.pdf   download>
Description: ColumbiaGrid Flexible Capacity Discussion Concepts 032312 draft
Type: Report
Status: DRAFT

 

03/23/2012 ColumbiaGrid Discussion Concepts for Intra-HourTransmission ATC Visability 032312 (v: 1)   

...nATCVisability032312 draft.pdf   download>
Description: ColumbiaGrid Discussion Concepts for Intra-HourTransmissionATCVisability032312
Type: Report
Status: DRAFT

 

03/19/2012 Action Items from 3.15.12 (v: 1)   

ActionItemsfrom3-15-12CGPM.pdf   download>
Description: Action Items from 3.15.12
Type: Minutes
Status: DRAFT
Contact

 

03/19/2012 Draft Planning Agenda (6.3.12) (v: 1)   

raftPlanningAgenda(5-3-12).pdf   download>
Description: Draft Planning Agenda (6.3.12)
Type: Agenda
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance