Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1621 - 1640 out of 3154.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

02/14/2012 Treasurer's Report (02.15.12) (v: 1)   

TreasurersReport(02.15.12).pdf   download>
Description: Treasurer's Report (02.15.12)
Type: Financial
Status: FINAL
Contact

 

02/13/2012 2012 Update to the 2011 Biennial Transmission Expansion Plan (v: 1)   

BP2012webdocument.pdf   download>
Description: 2012 Update to the 2011 Biennial Transmission Expansion Plan
Type: Document (pdf)
Status: DRAFT
Contact

 

02/13/2012 Inductor Sizing - HW North South 2100 MW (v: 1)   

request access >  login >
Description: Inductor Sizing - HW North South 2100 MW Transfer
Type: Spreadsheet
Status: DRAFT
Contact

 

02/13/2012 Inductor Sizing Scenario Results (v: 4)   

request access >  login >
Type: Spreadsheet
Status: DRAFT
Contact

 

02/13/2012 PSAST Dec 15 Action Items (v: 1)   

PSAST_Dec15_ActionItems.doc   download>
Description: Action Items
Type: Notes
Status: DRAFT
Contact

 

02/13/2012 PSAST Agenda (2.13.12) (v: 1)   

PSAST_Feb13_Agenda.doc   download>
Description: PSAST Agenda (2.13.12)
Type: Agenda
Status: DRAFT
Contact

 

02/09/2012 Planning Meeting Presentation (v: 1)   

PlanningMeeting.pptx   download>
Description: Planning Meeting Presentation
Type: Presentation
Status: DRAFT
Contact

 

02/09/2012 NTTG to CG Presentation (2.9.12) (v: 1)   

NTTGtoCG2-9-2012.ppt   download>
Description: NTTG to CG Presentation (2.9.12)
Type: Presentation
Status: DRAFT

 

02/08/2012 Adjacent Circuit Exemptions Disc Paper (v: 1)   

...tionsDiscPaper(2011.11.21).doc   download>
Description: Adjacent Circuit Exemptions Disc Paper
Type: Document (pdf)
Status: DRAFT

 

02/08/2012 2012 Study Requests (v: 1)   

2012StudyRequests.doc   download>
Description: 2012 Study Requests
Type: Document (pdf)
Status: DRAFT

 

02/06/2012 Table J1: Base Case Summary (v: 1)   

Tablej1.pdf   download>
Description: Table J1: Base Case Summary
Type: Document (pdf)
Status: DRAFT
Contact

 

02/06/2012 Table B2: ColumbiaGrid Ten-Year Plan (v: 1)   

TableB2.pdf   download>
Description: Table B2: ColumbiaGrid Ten-Year Plan
Type: Document (pdf)
Status: DRAFT
Contact

 

02/06/2012 Mapping Guidelines of Table TPL-001-2 (v: 1)   

...ingGuidelinesforTPL-001-2.xlsx   download>
Description: Mapping Guidelines of Table TPL-001-2
Type: Spreadsheet
Status: DRAFT

 

02/06/2012 Mapping Guideline of Table W-1 (1.9.12) (v: 1)   

...uidelineofTableW-1_1-9-12.xlsx   download>
Description: Mapping Guideline of Table W-1 (1.9.12)
Type: Spreadsheet
Status: DRAFT

 

02/06/2012 Draft Team Report (v: 06Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/06/2012 Project Metrics Comparison (v: 06Feb12)   

  risk of use agreement required >>
Type: Spreadsheet
Status: DRAFT
Contact

 

02/03/2012 Master Change Files_Initial Submittal (v: 1)   

request access >  login >
Description: Master Change Files For 13LW2-OP Initial Submittal
Type: Base Case
Status: DRAFT
Contact

 

02/01/2012 DRAFT Team Report (v: 01Feb12)   

  risk of use agreement required >>
Type: Report
Status: DRAFT
Contact

 

02/01/2012 DRAFT Project Metrics Summary (v: 01Feb12)   

  risk of use agreement required >>
Type: Spreadsheet
Status: DRAFT
Contact

 

02/01/2012 Biannual Member Meeting Agenda(02.15.12) (v: 1)   

...ualMeetingAgenda(02.15.12).pdf   download>
Description: Biannual Member Meeting Agenda(02.15.12)
Type: Agenda
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities