Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1681 - 1700 out of 3246.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163  

02/28/2012 Draft Report- Word 2010 format (v: 28Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/23/2012 Process Proposal for a Dynamic Issues Commercial Forum (v: 1)   

...ommercialForum(2012.02.21).pdf   download>
Description: Process Proposal for a Dynamic Issues Commercial Forum
Type: Report
Status: DRAFT
Contact

 

02/22/2012 13HSP1-OP Draft Prerun Case Summary (v: 1)   

confidentiality agreement required >
Type: Spreadsheet
Status: DRAFT
Contact

 

02/21/2012 Board Minutes (12-14-11) (v: 1)   

BoDMinutes(12-14-11).pdf   download>
Description: Board Minutes (12-14-11)
Type: Minutes
Status: FINAL
Contact

 

02/21/2012 CG Order 1000 Stakeholder Meeting (2.17.12) (v: 1)   

...takeholderMeeting2-17-2012.ppt   download>
Description: CG Order 1000 Stakeholder Meeting (2.17.12)
Type: Presentation
Status: DRAFT
Contact

 

02/21/2012 Flex Reserves Capacity Discussion (2.21.12) (v: 1)   

...apacityDiscussion(2.21.12).pdf   download>
Description: Flex Reserves Capacity Discussion (2.21.12)
Type: Presentation
Status: FINAL

 

02/21/2012 PDF version of draft report for discussion (v: 21Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/21/2012 Word 2010 version draft report for discussion (v: 21Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/20/2012 JI FlexCapacity Meeting Agenda (2.21.12) (v: 1)   

...CapacityMtgAgenda(2.21.12).pdf   download>
Description: JI-FlexCapacity Meeting Agenda (2.21.12)
Type: Agenda
Status: FINAL

 

02/20/2012 CAISO Flexible Ramping (02.21.12) (v: 1)   

...xible_Ramping(2)mar2.21.12.pdf   download>
Description: CAISO Flexible Ramping for JI FlexCapacity Meeting
Type: Presentation
Status: FINAL

 

02/17/2012 WIST Agenda (3.1.12) (v: 1)   

WIST3-1-12DraftAgenda.pdf   download>
Description: WIST Agenda 3.1.12
Type: Agenda
Status: DRAFT

 

02/17/2012 PSAST Feb 13ActionItems (v: 1)   

confidentiality agreement required >
Description: PSAST Feb 13 ActionItems
Type: Notes
Status: DRAFT
Contact

 

02/17/2012 22LSP1-TEP_ReferenceCase_rev1_PWB (v: 1)   

request access >  login >
Description: 22LSP1-TEP_ReferenceCase_rev1_PWB
Type: Base Case
Status: DRAFT
Contact

 

02/17/2012 22LSP1-TEP_ReferenceCase_rev1_EPC (v: 1)   

request access >  login >
Description: 22LSP1-TEP_ReferenceCase_rev1_EPC
Type: Base Case
Status: DRAFT
Contact

 

02/17/2012 Scaled Loads By TEPPC Defined BA (v: 1)   

request access >  login >
Description: Scaled Loads By TEPPC Defined BA
Type: Spreadsheet
Status: DRAFT
Contact

 

02/17/2012 RNP-NWEC Transmission Planning Framework Draft (2.13.12) (v: 1)   

...missionPlanningFramework-2.pdf   download>
Description: RNP-NWEC Transmission Planning Framework Draft (2.13.12)
Type: Report
Status: DRAFT

 

05/09/2014 Allocated Share Recalculation (05.8.14) (v: 2)   

...recalculation (rev 5-8-14).pdf   download>
Description: Allocated Share Recalculation (05.08.14); shares; financial
Type: Financial
Status: DRAFT

 

02/16/2012 v6 WCEA CEV Intro Slides (2.17.12) (v: 1)   

v6WCEACEVintroslides.pdf   download>
Description: v6 WCEA CEV Intro Slides (2.17.12)
Type: Presentation
Status: DRAFT
Contact

 

02/16/2012 Attendance List (02.15.12) (v: 1)   

AttendanceList(021512).PDF   download>
Description: Attendance List (02.15.12)
Type: Attendence Sheets
Status: FINAL

 

02/16/2012 Revised Summary Table w/TCRM (v: 16Feb12)   

  risk of use agreement required >>
Type: Spreadsheet
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities