Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1721 - 1740 out of 3149.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

10/18/2011 Revised Study Plan (v: 1)   

..._Study_Plan-Revised05Oct11.doc   download>
Type:
Status: DRAFT
Contact

 

10/17/2011 Treasurer's Report (10.19.11) (v: 1)   

TreasurersReport(10.19.11).pdf   download>
Description: Treasurer's Report (10.19.11)
Type: Financial
Status: FINAL
Contact

 

10/07/2011 Member Meeting Notice (10.19.11) (v: 1)   

MemberMtgNotice(10.19.11).pdf   download>
Description: Biannual Member Meeting Notice (10.19.11)
Type: Notice
Status: FINAL
Contact

 

10/07/2011 Member Meeting Agenda (10.19.11) (v: 1)   

...berMeetingAgenda(10.19.11).pdf   download>
Description: Member Meeting Agenda (10.19.11)
Type: Agenda
Status: FINAL

 

10/05/2011 Proposed Modifications to Drafting Team Issue Paper MOD-29-1a (09.19.11) (v: 1)   

...hitePaper w_Mods(09.19.11).pdf   download>
Description: White Paper with Proposed Modifications to Drafting Team Issue Paper MOD-029-1a (09.19.11)
Type: Corporate Doc
Status: DRAFT

 

10/05/2011 Draft SAR with JI Strike Team Proposed Modifications MOD-029 Version 1 (09-19-11) (v: 1)   

...FormMOD-029Vers1(09-19-11).pdf   download>
Description: Draft SAR with JI Strike Team Proposed Modifications MOD-029 Version 1 (09-19-11)
Type: Document (pdf)
Status: DRAFT

 

10/04/2011 Board Agenda (10.19.11) (v: 1)   

Board Agenda (10.19.11).pdf   download>
Description: Board Agenda (10.19.11)
Type: Agenda
Status: FINAL
Contact

 

10/04/2011 Board Meeting Notice (10.19.11) (v: 1)   

...d Meeting Notice(10.19.11).pdf   download>
Description: Board Meeting Notice (10.19.11)
Type: Notice
Status: FINAL
Contact

 

09/28/2011 Series Inductor Data (v: 1)   

request access >  login >
Description: Results for various series inductor sizes in the PSAST area.
Type: Spreadsheet
Status: DRAFT
Contact

 

09/27/2011 Path 3 Upgrade Phase 2 PRG Agenda (10.3.11) (v: 1)   

...3UpgradePhase2PRGmtg3oct11.pdf   download>
Description: Path 3 Upgrade Phase 2 Agenda
Type: Agenda
Status: DRAFT

 

09/08/2011 Treasurer's Report (09.06.11) (v: 1)   

TreasurersReport(09.06.11).pdf   download>
Description: Treasurer's Report (09.06.11)
Type: Financial
Status: FINAL
Contact

 

09/06/2011 22LS1S PWB Format- Alberta Fixed (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

08/31/2011 Generation Displacement Method-Preliminary Results (v: 1)   

...nt Results Summary 31Aug11.pdf   download>
Type: Document (pdf)
Status: DRAFT
Contact

 

08/31/2011 QA's for TVLs and EIM (8.31.11) (v: 1)   

QAsforTVLsandEIM_083111.doc   download>
Description: QA's for TVLs and EIM (8.31.11)
Type: Report
Status: DRAFT

 

09/13/2011 JGC Letter - Sept 1, 2011 (v: 2)   

JGCLetter-1Sept2011(Final).pdf   download>
Description: JGC Letter - Sept 1, 2011
Type: Letter
Status: DRAFT

 

08/31/2011 DT Issues Summary - Attachment A (v: 1)   

TIssuesSummary-AttachmentA.doc   download>
Description: DT Issues Summary - Attachment A
Type: Report
Status: DRAFT

 

08/29/2011 WECC SCG Meeting Agenda (8.31.11) (v: 1)   

SCGMeetingAgenda8-31-2011.pdf   download>
Description: SCG Meeting Agenda (8.31.11)
Type: Agenda
Status: DRAFT

 

08/29/2011 Hotels in the Area (v: 1)   

ColumbiaGridHotelRates2011.pdf   download>
Type: Document (pdf)
Status: DRAFT

 

08/29/2011 Directions to ColumbiaGrid Offices (v: 1)   

...tionstoColumbiaGridOffices.pdf   download>
Type: Document (pdf)
Status: DRAFT

 

08/29/2011 Findings Outline EIM AWG 8.26.11 draft (v: 1)   

...gsOutlineEIMAWG082611draft.pdf   download>
Description: Findings Outline EIM AWG 8.26.11 draft
Type: Document (pdf)
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance