Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



1761 - 1780 out of 3250.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163  

12/14/2011 Draft Board of Directors Minutes (10.09.11) (v: 1)   

BoDMinutes(10.09.11).pdf   download>
Description: Board of Directors Minutes (10.09.11)
Type: Minutes
Status: DRAFT
Contact

 

12/14/2011 Final MSOS White Pape (12.14.11) (v: 1)   

nalMSOSWhitePape(12.14.11).pdf   download>
Description: Final MSOS White Pape (12.14.11)
Type: Document (pdf)
Status: FINAL

 

12/14/2011 BPA Dynamic Transfer Limit Study Methodology Feb 2010 (v: 1)   

...mitStudyMethdology-Feb2010.pdf   download>
Description: BPA Dynamic Transfer Limit Study Methodology Feb 2010
Type: Report
Status: FINAL

 

12/14/2011 CAISO Impact of Dynamic Schedules on Interfaces (v: 1)   

...edulesonInterfaces-Jan2011.pdf   download>
Description: CAISO Impact of Dynamic Schedules on Interfaces
Type: Report
Status: DRAFT

 

12/13/2011 PSAST Agenda (12.15.11) (v: 1)   

PSAST_Dec15_Agenda.doc   download>
Description: PSAST Agenda (12.15.11); Agenda
Type: Agenda
Status: DRAFT
Contact

 

12/12/2011 EIM Update (12.14.11) (v: 1)   

EIMUpdate(12.14.11)final.pdf   download>
Description: EIM Update (12.14.11)
Type: Presentation
Status: FINAL
Contact

 

12/12/2011 OASIS Update (v: 1)   

ASISUpdateBoMeet(12_14_11).pdf   download>
Description: OASIS Update
Type: Presentation
Status: DRAFT
Contact

 

12/12/2011 Planning Presentation (12.2011) (v: 1)   

CGBoardPlanning(12.2011).pdf   download>
Description: Planning Presentation (12.2011)
Type: Presentation
Status: DRAFT
Contact

 

12/12/2011 Inductor Sizing TCRM Results (v: 1)   

request access >  login >
Description: Excel Sheet Summarizing TCRM Results for Inductor Sizing and All Supporting TCRM Files
Type: Spreadsheet
Status: DRAFT
Contact

 

12/12/2011 DTC TF TVL Webinar (12.12.11) (v: 1)   

...1-12-12 (Final Version v8).pdf   download>
Description: DTC TF TVL Webinar (12.12.11)
Type: Presentation
Status: DRAFT

 

12/09/2011 Board Meeting Schedule 2012 (12.14.11) (v: 1)   

...tingSchedule2012(12.14.11).pdf   download>
Description: Board Meeting Schedule 2012;
Type: Document (pdf)
Status: FINAL
Contact

 

12/09/2011 WIST Agenda( 12.11.11) (v: 1)   

DraftAgenda(12.11.11).pdf   download>
Description: Draft Agenda( 12.11.11)
Type: Agenda
Status: FINAL

 

12/09/2011 Treasurer's Report (12.14.11) (v: 1)   

TreasurersReport(12.14.11).pdf   download>
Description: Treasurer's Report
Type: Financial
Status: FINAL
Contact

 

12/06/2011 PSE Attachment K PSAT Mtg Presentation (v: 1)   

EAttKPSATMtg2011(12-15-11).pdf   download>
Description: PSE Attachment K PSAT Mtg Presentation
Type: Presentation
Status: DRAFT

 

12/06/2011 PSE Plan 2011 Draft (v: 1)   

PSEPlan2011Draft.pdf   download>
Description: PSE Plan 2011 Draft
Type: Report
Status: DRAFT
Contact

 

12/06/2011 SPSC-CREPC letter to JI Final (12.06.11) (v: 1)   

...C-CREPC letter to JI Final.pdf   download>
Description: "Joint Initiative participants share information on participation in and analysis of the Initiatives so that states and provinces are able to form an accurate picture of where we are in the Western Interconnection and how much further we may have to go in lowering the costs of integrating variable generation."
Type: Document (pdf)
Status: FINAL

 

12/02/2011 Action Items from 12.1.11 (v: 1)   

ctionItemsfrom12-1-11CGPM.docx   download>
Description: Action Items from 12.1.11
Type: Minutes
Status: DRAFT
Contact

 

02/09/2012 Draft Planning Agenda (2.9.12) (v: 2)   

raftPlanningAgenda(2-9-12).pdf   download>
Description: Draft Planning Agenda (2.9.12)
Type: Agenda
Status: DRAFT
Contact

 

12/01/2011 Footnote B (11.30.11 discussion) (v: 1)   

30NovdiscussionFootnoteb.doc   download>
Description: Footnote B (11.30.11 discussion)
Type: Minutes
Status: DRAFT

 

12/01/2011 BPA Scenario Planning (v: 1)   

...riosWorkshopQuestionsforCG.doc   download>
Description: BPA Scenario Planning
Type: Notes
Status: DRAFT

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance