Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1801 - 1820 out of 3621.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182  

05/08/2012 22LSP1-TEP Initial Submittal Files (v: 1)   

request access >  login >
Description: 22LSP1-TEP Initial Submittal Files
Type: Base Case
Status: DRAFT
Contact

 

05/04/2012 North to South Study Summary (v: 1)   

request access >  login >
Description: North to South Study Summary
Type: Document (pdf)
Status: DRAFT
Contact

 

05/03/2012 PRC 023 CG Meeting (Avista 5.3.12) (v: 1)   

PRC_023_CG Meeting.pdf   download>
Description: PRC 023 CG Meeting (Avista 5.3.12)
Type: Presentation
Status: DRAFT

 

05/03/2012 Transient Stability CG Planning Meeting (5.3.12) (v: 1)   

...lity_CG_PlanningMtg03May12.pdf   download>
Description: Transient Stability CG Planning Meeting (5.3.12)
Type: Presentation
Status: DRAFT
Contact

 

05/03/2012 WECC Comprehensive Project Review Waiver (v: 1)   

...ensiveProjectReview Waiver.pdf   download>
Description: WECC Comprehensive Project Review Waiver
Type: Report
Status: DRAFT
Contact

 

05/03/2012 Quanta Technology General Capabilities CG 2012 (v: 1)   

...ralCapabilitiesCG2012Final.pdf   download>
Description: Quanta Technology General Capabilities CG 2012
Type: Presentation
Status: DRAFT

 

05/01/2012 Updated TTC and TCRM Results (v: 1)   

request access >  login >
Description: Updated TTC and TCRM Results
Type: Spreadsheet
Status: DRAFT
Contact

 

05/01/2012 2012 System Assessment Cases epc format (v: 1)   

request access >  login >
Description: 2012 System Assessment Cases in GE PSLF EPC Format
Type: Base Case
Status: DRAFT
Contact

 

04/23/2012 BPA Phase III Intra-Hour February Report (v: 1)   

...Intra-Hour_February_Report.pdf   download>
Description: BPA Phase III Intra-Hour February Report
Type: Report
Status: FINAL

 

04/23/2012 BPA Phase_II_and_III_Intra-Hour_Report (v: 1)   

..._and_III_Intra-Hour_Report.pdf   download>
Description: BPA Phase_II_and_III_Intra-Hour_Report
Type: Report
Status: FINAL

 

04/23/2012 DSS Present entation ver 3 (04.23.12) (v: 3)   

... Present JI 20120423_ver 3.pdf   download>
Description: DSS Presention JI 20120423_ver 3
Type:
Status: FINAL

 

04/23/2012 I-TAP webExchange Initial Presentation (04.23.12) (v: 1)   

...tialPresentation(04.23.12).pdf   download>
Description: I-TAP webExchange Initial Presentation (04.23.12)
Type:
Status: FINAL

 

04/23/2012 DSS Presentation 20120423 ver2 (04.23.12) (v: 1)   

S_20120423_ver 2(04.23.12).pdf   download>
Description: DSS Presentation 20120423 ver2 (04.23.12)
Type: Report
Status: FINAL

 

04/23/2012 PSEI Hour BP 20100524 (v: 1)   

PSEI Hour BP 20100524.pdf   download>
Description: PSEI Hour BP 20100524
Type: Report
Status: FINAL

 

04/23/2012 PSE Within Hour TSR 20090526 (v: 1)   

E Within Hour TSR 20090526.pdf   download>
Description: PSE Within Hour TSR 20090526
Type: Report
Status: FINAL

 

04/23/2012 PSE Intra-Hour Schedule Submittal Timing Example (v: 1)   

...e Submittal Timing Example.pdf   download>
Description: PSE Intra-Hour Schedule Submittal Timing Example
Type: Report
Status: FINAL

 

04/23/2012 PGE Intra-hour Requests for Interchange.r1.1 (7-7-2011) (v: 1)   

..._Interchange_r1 1 7-7-2011.pdf   download>
Description: PGE Intra-hour Requests for Interchange.r1.1 (7-7-2011)
Type: Report
Status: FINAL

 

04/23/2012 PacifiCorp BP #48 Intra Hour (v: 1)   

cifiCorp BP #48 Intra Hour.pdf   download>
Description: PacifiCorp BP #48 Intra Hour
Type: Report
Status: FINAL

 

04/23/2012 IPC BP FINAL Section 25 Intra-hour Transmission Service Requests and Scheduling v0 07-05-11 (v: 1)   

...and_Scheduling_v0_07-05-11.pdf   download>
Description: IPC BP FINAL Section 25 Intra-hour Transmission Service Requests and Scheduling v0 07-05-11
Type: Report
Status: FINAL
Contact

 

05/01/2012 BPA Phase I Intra-Hour Report (v: 1)   

... Phase_I_Intra-Hour_Report.pdf   download>
Description: BPA Phase I Intra-Hour Report
Type: Report
Status: FINAL

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities