Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1841 - 1860 out of 3154.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158  

05/31/2011 PNW-CA Feasibility Study (06.02.11) (v: 1)   

pnw-ca_feasibility_study.pdf   download>
Description: PNW-CA Feasibility Study (06.02.11)
Type: Report
Status: FINAL

 

05/31/2011 BPA NW-CA Slides TUG BOG (06.02.11) (v: 1)   

...TUGBOG_CGPlanMtg2011-06-02.pdf   download>
Description: BPA NW-CA Slides TUG BOG (06.02.11)
Type: Report
Status: FINAL

 

05/31/2011 Brattle WIRES Jobs Study May2011 (06.02.11) (v: 1)   

...e-WIRES_Jobs_Study_May2011.pdf   download>
Description: Brattle WIRES Jobs Study May2011 (06.02.11)
Type: Report
Status: FINAL

 

05/27/2011 WECC DRAFT 10-Year Plan Summary (06.03.11) (v: 1)   

...DRAFT_10-Year_Plan_Summary.pdf   download>
Description: WECC DRAFT 10-Year Plan Summary (06.03.11)
Type: Report
Status: FINAL
Contact

 

05/27/2011 SCG Update June 2011 (06.03.11) (v: 1)   

SCG_Update_June_2011.pdf   download>
Description: SCG Update June 2011
Type: Report
Status: FINAL
Contact

 

05/27/2011 COI Utilization Report (06.02.11) (v: 1)   

coi_utilization_report.pdf   download>
Description: COI Utilization Report (06.02.11)
Type: Report
Status: FINAL
Contact

 

05/19/2011 BPA May 18, 2011 presentation (v: 1)   

WOCN_Presentation_BPA.ppt   download>
Type: Presentation
Status: DRAFT

 

05/17/2011 Treasurer's Report (05.16.11) (v: 1)   

easurer'sReport (05.16.11).pdf   download>
Description: Treasurer's Report (05.16.11)
Type: Financial
Status: FINAL
Contact

 

05/13/2011 22LS1-S Seedcase (1.5 MB .zip file) (v: 1)   

request access >  login >
Description: 2022 Light Summer - 22LS1-S seedcase
Type: Base Case
Status: DRAFT
Contact

 

05/11/2010 OASIS Functional Agreement Amendment - final (v: 1)   

...ndment_final_signaturecopy.pdf   download>
Description: Amendment to OASIS Functional Agreement -signature copy
Type: Functional Agreement
Status: FINAL
Contact

 

05/31/2011 Draft Planning Agenda (6.2.2011) (v: 1)   

raftPlanningAgenda(6-2-11).pdf   download>
Description: Planning Agenda 6.2.2011
Type: Agenda
Status: DRAFT

 

05/06/2011 Action Items from 5.5.2011 (v: 1)   

ActionItemsfrom5-5-11CGPM.pdf   download>
Description: Action Items from 5.5.2011
Type: Minutes
Status: DRAFT
Contact

 

05/05/2011 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)   

...012TransmissionPlanDraft1.xlsx   download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact

 

05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)   

CGPlgMtg5-5-11.pdf   download>
Type: Presentation
Status: DRAFT
Contact

 

05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)   

...TTransExpPlanResults5-4-11.pdf   download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact

 

05/04/2011 WECC New Transmission (v: 1)   

WECCNewTransmission.docx   download>
Description: WECC New Transmission
Type: Report
Status: DRAFT

 

05/04/2011 Table 1 CG 10 Year Plan (v: 1)   

Table1CG10YearPlan.xlsx   download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact

 

04/28/2011 BPA commented version (v: 1)   

...sure_Study_Draft__3_BPA-cg.doc   download>
Type:
Status: DRAFT

 

04/21/2011 EIM Update BOD (4.20.2011) (v: 1)   

EIMUpdateBOD042011.pdf   download>
Description: EIM Update BOD (4.20.2011)
Type: Presentation
Status: DRAFT
Contact

 

04/21/2011 PVsimulationsForCentraliaStudy.zip (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities