Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1881 - 1900 out of 3593.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  


02/20/2012 JI FlexCapacity Meeting Agenda (2.21.12) (v: 1)   

...CapacityMtgAgenda(2.21.12).pdf   download>
Description: JI-FlexCapacity Meeting Agenda (2.21.12)
Type: Agenda
Status: FINAL

 

02/20/2012 CAISO Flexible Ramping (02.21.12) (v: 1)   

...xible_Ramping(2)mar2.21.12.pdf   download>
Description: CAISO Flexible Ramping for JI FlexCapacity Meeting
Type: Presentation
Status: FINAL

 

02/17/2012 WIST Agenda (3.1.12) (v: 1)   

WIST3-1-12DraftAgenda.pdf   download>
Description: WIST Agenda 3.1.12
Type: Agenda
Status: DRAFT

 

02/17/2012 PSAST Feb 13ActionItems (v: 1)   

confidentiality agreement required >
Description: PSAST Feb 13 ActionItems
Type: Notes
Status: DRAFT
Contact

 

02/17/2012 22LSP1-TEP_ReferenceCase_rev1_PWB (v: 1)   

request access >  login >
Description: 22LSP1-TEP_ReferenceCase_rev1_PWB
Type: Base Case
Status: DRAFT
Contact

 

02/17/2012 22LSP1-TEP_ReferenceCase_rev1_EPC (v: 1)   

request access >  login >
Description: 22LSP1-TEP_ReferenceCase_rev1_EPC
Type: Base Case
Status: DRAFT
Contact

 

02/17/2012 Scaled Loads By TEPPC Defined BA (v: 1)   

request access >  login >
Description: Scaled Loads By TEPPC Defined BA
Type: Spreadsheet
Status: DRAFT
Contact

 

02/17/2012 RNP-NWEC Transmission Planning Framework Draft (2.13.12) (v: 1)   

...missionPlanningFramework-2.pdf   download>
Description: RNP-NWEC Transmission Planning Framework Draft (2.13.12)
Type: Report
Status: DRAFT

 

05/09/2014 Allocated Share Recalculation (05.8.14) (v: 2)   

...recalculation (rev 5-8-14).pdf   download>
Description: Allocated Share Recalculation (05.08.14); shares; financial
Type: Financial
Status: DRAFT

 

02/16/2012 v6 WCEA CEV Intro Slides (2.17.12) (v: 1)   

v6WCEACEVintroslides.pdf   download>
Description: v6 WCEA CEV Intro Slides (2.17.12)
Type: Presentation
Status: DRAFT
Contact

 

02/16/2012 Attendance List (02.15.12) (v: 1)   

AttendanceList(021512).PDF   download>
Description: Attendance List (02.15.12)
Type: Attendence Sheets
Status: FINAL

 

02/16/2012 Revised Summary Table w/TCRM (v: 16Feb12)   

  risk of use agreement required >>
Type: Spreadsheet
Status: DRAFT
Contact

 

02/15/2012 22LSP1-TEP Reference Case PWB (v: 1)   

request access >  login >
Description: 22LSP1-TEP Reference Case in PWB
Type: Base Case
Status: DRAFT
Contact

 

02/15/2012 22LSP1-TEP Reference Case EPC (v: 1)   

request access >  login >
Description: 22LSP1-TEP Reference Case in PWB
Type: Base Case
Status: DRAFT
Contact

 

02/15/2012 Action Items from 2.9.12 (v: 1)   

ActionItemsfrom2-9-12CGPM.pdf   download>
Description: Action Items from 2.9.12
Type: Minutes
Status: DRAFT
Contact

 

02/15/2012 Draft Planning Agenda (3.15.12) (v: 1)   

aftPlanningAgenda(3-15-12).pdf   download>
Description: Planning Agenda 3.15.12
Type: Agenda
Status: DRAFT

 

02/15/2012 Draft Report-MSWord 2012 format (v: 15Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/15/2012 Draft Report-pdf format (v: 15Feb12)   

  risk of use agreement required >>
Type:
Status: DRAFT
Contact

 

02/15/2012 FERC Order 1000 Presentation (2.15.12) (v: 1)   

CGOrder1000Status2-15-2012.pdf   download>
Description: FERC Order 1000 Presentation (2.15.12)
Type: Presentation
Status: DRAFT
Contact

 

02/15/2012 Planning Presentation (2.15.12) (v: 1)   

CGBoardPlanning(2.15.12).pdf   download>
Description: Planning Presentation (2.15.12)
Type: Presentation
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance