Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document

Older documents may be found archived on the previous ColumbiaGrid website here.

1901 - 1920 out of 3204.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161  

05/31/2011 Draft Planning Agenda (6.2.2011) (v: 1)   

raftPlanningAgenda(6-2-11).pdf   download>
Description: Planning Agenda 6.2.2011
Type: Agenda
Status: DRAFT

 

05/06/2011 Action Items from 5.5.2011 (v: 1)   

ActionItemsfrom5-5-11CGPM.pdf   download>
Description: Action Items from 5.5.2011
Type: Minutes
Status: DRAFT
Contact

 

05/05/2011 ColumbiaGrid 2012 Transmission Plan Draft (v: 1)   

...012TransmissionPlanDraft1.xlsx   download>
Description: ColumbiaGrid 2012 Transmission Plan Draft
Type: Spreadsheet
Status: DRAFT
Contact

 

05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)   

CGPlgMtg5-5-11.pdf   download>
Type: Presentation
Status: DRAFT
Contact

 

05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)   

...TTransExpPlanResults5-4-11.pdf   download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact

 

05/04/2011 WECC New Transmission (v: 1)   

WECCNewTransmission.docx   download>
Description: WECC New Transmission
Type: Report
Status: DRAFT

 

05/04/2011 Table 1 CG 10 Year Plan (v: 1)   

Table1CG10YearPlan.xlsx   download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact

 

04/28/2011 BPA commented version (v: 1)   

...sure_Study_Draft__3_BPA-cg.doc   download>
Type:
Status: DRAFT

 

04/21/2011 EIM Update BOD (4.20.2011) (v: 1)   

EIMUpdateBOD042011.pdf   download>
Description: EIM Update BOD (4.20.2011)
Type: Presentation
Status: DRAFT
Contact

 

04/21/2011 PVsimulationsForCentraliaStudy.zip (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

04/20/2011 Board Minutes (02.16.11) (v: 1)   

BoardMinutes(021611).pdf   download>
Description: Board Minutes (02.16.11)
Type: Minutes
Status: FINAL
Contact

 

04/20/2011 Attendance List (4.20.2011) (v: 1)   

AttendanceList4.20.11.pdf   download>
Description: Attendance List (4.20.2011)
Type: Attendence Sheets
Status: DRAFT

 

04/19/2011 Transmission Planning Update (4.20.11) (v: 1)   

...TransmissionPlanningUpdate.pdf   download>
Description: 4-20-2011 Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact

 

04/13/2011 Treasurer's Report (04.20.11) (v: 1)   

Treasurer's Report.pdf   download>
Description: Treasurer's Report (04.20.11)
Type: Financial
Status: FINAL
Contact

 

04/14/2011 Updated Draft Report (v: 1)   

... CG GH PSE) and new graphs.doc   download>
Type: Report
Status: DRAFT
Contact

 

04/14/2011 Appendix-WOCN VoltageStabilityImpact (v: 1)   

request access >  login >
Type: Document (pdf)
Status: DRAFT
Contact

 

04/13/2011 Visio-DTC Stage 1 Draft Methodology (v: 1)   

...-DTCStage1DraftMethodology.pdf   download>
Description: Visio-DTC Stage 1 Draft Methodology
Type: Document (pdf)
Status: DRAFT

 

04/13/2011 DTC TF Meeting Notes 4.5.2011 (v: 1)   

TCTF-MtgNotes(05April2011).doc   download>
Description: DTC TF Meeting Notes 4.5.2011
Type: Minutes
Status: DRAFT

 

04/06/2011 Board Agenda (4.20.11) (v: 1)   

BoardAgenda(4.20.11).pdf   download>
Description: Board Agenda (4.20.11)
Type: Agenda
Status: FINAL
Contact

 

04/06/2011 BoardMeetingNotice(4.20.11) (v: 1)   

oardMeetingNotice(4.20.11).pdf   download>
Description: Board Meeting Notice(4.20.11)
Type: Notice
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities