Data due for 11HS2-OP
Date and Time: Monday Aug 16, 2010 5:00Type: NW Area Coordinator
Case Description
I. Case Due Dates:
To Area Coordinator: August 13, 2010
To Staff: September 17, 2010
II. Purpose: To represent anticipated operating conditions with heavy flows to California from the Northwest and moderate flows elsewhere.
III. Items to be Prepared:
From Case: 2010 HS3 Operating Case
Stability Data: Master Dynamics File (1)
Significant Changes: 2010 HS3 Operating Case
IV. Loads: 100% of summer peak
V. Time: Late afternoon (1600 to 1800 hours), summer conditions.
VI.
| Generation | Hydro | Thermal | Renewable |
| Canada | High | -- | -- |
| Northwest | High | High | -- |
| Idaho/Montana | Median | High | -- |
| Colorado/Wyoming | High | High | -- |
| Northern California Hydro | High | -- | -- |
| Northern California | Median | High | -- |
| Southern California | -- | -- | -- |
| Arizona/New Mexico | -- | High | -- |
VII.
| Interchange** | Condition | Target* | % Rating |
| Canada to Northwest | Heavy | 2300 | 73% |
| Northwest to California | |||
| (COI/RATS) | Heavy | 4650 | 95% |
| (PDCI) | Heavy | 2980 | 96% |
| Path 15 S-N | -- | -- | -- |
| Wyoming/Idaho to Northwest | -- | -- | -- |
| Montana to Northwest | Moderate | 1200 | 55% |
| Utah/Colorado to Southwest | Light | -- | -- |
| Southwest to Calif. (EOR/WOR) | Moderate | 3000/5800 | 37%/55% |
| Intermountain to Adelanto DC | Heavy | 1660 | 86% |
| Midway to Vincent | Heavy | 4000 | 100% |
*Actual flows within ± 10% of target are acceptable, but not to exceed the actual rating of the path.
**Targets may be altered as anticipated operting conditions become more clearly known. Renewables should be based onindividual entities' Renewable Portfolio Standard.
(Note) Where no target flows are specified actual scheduled transfers should be based on each areas load and generation (deficiency/surplus) balance and economical generation dispatch. The objective of the case should be kept in mind and schedules should be coordinated between areas prior to data submittal.
(1) Only Corrections to the MDF or new data for the MDF need be submitted.