List View

Back to list >

Dynamic Transfer Capability Task Force Mtg

Date and Time: Friday Oct 29, 2010 10:00-3:00
Location: CG Office
Type: Workgroup Meetings
Organizer: Jeff Miller/Rich Bayless/Gordon Dobson-Mack

Conference Bridge: 1-877-295-7894, Guest Code 700

WebEx Info:
To join the online meeting (Now from the Apple iPhone (R) too!)
-------------------------------------------------------
1. Go to https://columbiagrid.webex.com/columbiagrid/j.php?ED=157089382&UID=1174490607&PW=NNTExYzgwZDUx&RT=MiM0
2. If requested, enter your name and email address.
3. If a password is required, enter the meeting password: 2Attend
4. Click "Join".

 



Documents
11/03/2010 Walla Walla Area Wind Generation 10.29.10 (v: 1)   

...AreaWindGeneration10-29-10.pdf   download>

 

11/03/2010 CAISO Technical Appendices for Renewable Integration Studies (v: 1)   

TechnicalAppendixfor20%.pdf   download>

 

11/03/2010 CAISOIntegration of Renewable Resources (v: 1)   

ISOstudyofthe20%renewables.pdf   download>

 

11/03/2010 Presentation on CAISO intermittent dynamic transfer capability (v: 1)   

CAISO-DTS-COI-WOR.pdf   download>

 

10/29/2010 BPA Dynamic Transfer Limit Study Methodology (v: 1)   

DTLS_methodology_F.pdf   download>

 

10/29/2010 Idaho DTC Study Slides (v: 1)   

IPCO-DTLStudy-Background.pdf   download>

 

10/26/2010 BPA CG WIST Review of Dynamic Transfer Capability Studies (v: 1)   

WIST100520.pdf   download>

 

10/12/2010 Ca DTL Final Proposal (10.14.10) (v: 1)   

Ca DTL Final Proposal.pdf   download>

 

02/10/2010 Powertech Summary of 2008 DS Lim Study (v: 1)   

...echsummaryof2008DSLimStudy.pdf   download>

 



WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities