Cross Cascades North Call

Date and Time: Wednesday Sep 07, 2011 1:00 - 3:00
Location: Conference Call
Type: Workgroup Meetings
Organizer: Gordon Comegys

1. Go to https://columbiagrid.webex.com/columbiagrid/j.php?ED=179450092&UID=0&PW=NMmEyMWQ0MWNm&RT=MiM0
2. If requested, enter your name and email address.
3. If a password is required, enter the meeting password: 2Attend
4. Click "Join".
5. To join Audio part of the conference, follow the instructions on the dialogue box, enter in phone number for Webex to call you.

AGENDA:

1. Comments on Proposed Study Plan revision (BPA and others)
2. Generation Displacement Method Study Results (CG)
    a. Specific West of Cascades North interface voltage stability limits
    b. Comprehensive voltage stability limit screening results (other than WOCN interface)
    c. Comprehensive contingency analysis results on voltage stability limited case
3. Load Scaling Method Study Results (BPA)



Documents
08/31/2011 Generation Displacement Method-Preliminary Results (v: 1)   

...nt Results Summary 31Aug11.pdf   download>

 



WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance