Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



2001 - 2020 out of 3268.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164  

03/17/2011 Path 3 Upgrade Phase 2 PRG Agenda (3.21.11) (v: 1)   

...2 Kick-off Meeting 21mar11.doc   download>
Description: Path 3 Upgrade Phase 2 Kick-off Mtg Agenda
Type: Agenda
Status: DRAFT

 

03/16/2011 DTC TF Phase 1 Report (3.16.11) (v: 1)   

DTCTFPhaseFullReport031611.pdf   download>
Description: The Dynamic Transfer Capability Task Force has completed a report documenting Phase 1 of its work to develop a methodology for determining dynamic transfer capability limits. If you have any questions or comments, please refer them to Marv Landauer (email).
Type: Report
Status: DRAFT
Contact

 

03/16/2011 Wind Sheds (v: 1)   

wind_sheds.pdf   download>
Description: Wind Sheds
Type: Map
Status: DRAFT
Contact

 

03/16/2011 CG Planning Mtg WRS1-1 (3.17.11) (v: 1)   

CGPlgMtgWRS1-1 17Mar11.pdf   download>
Description: 2011 WECC Reliability Subcommittee Report
Type: Presentation
Status: DRAFT
Contact

 

03/16/2011 2011 Study Requests (v: 1)   

2011StudyRequests1.doc   download>
Description: 2011 Study Requests
Type: Document (pdf)
Status: DRAFT
Contact

 

03/16/2011 Table 5 Projects in System Assessment (v: 1)   

Table5ProjinSA.xlsx   download>
Description: Table 5 Projects in System Assessment
Type: Spreadsheet
Status: DRAFT
Contact

 

03/16/2011 Table 1 Ten Year Plan (v: 1)   

Table1TenYearPlan.xlsx   download>
Description: Table 1 Ten Year Plan
Type: Spreadsheet
Status: DRAFT
Contact

 

03/16/2011 Centralia Study Status 3.18.11 (v: 1)   

...traliaStudyStatus3-18-2011.pdf   download>
Description: Centralia Study Status 3.18.11
Type: Presentation
Status: DRAFT
Contact

 

03/15/2011 Centralia Study Status 3.15.11 (v: 1)   

...traliaStudyStatus3-15-2011.pdf   download>
Description: Centralia Study Status 3.15.11
Type: Presentation
Status: DRAFT
Contact

 

03/15/2011 12HW-OP Final Submittal to WECC (v: 1)   

request access >  login >
Description: 12HW2-OP Final Submittal to WECC: Contains sign off sheets, L&R file, dyd update, case change epcl, change case in .sav format.
Type: Base Case
Status: DRAFT
Contact

 

02/17/2011 Board Minutes(12.15.10) (v: 1)   

BoardMinutes(12.15.10).pdf   download>
Description: BoardMinutes(12.15.10)
Type: Minutes
Status: FINAL
Contact

 

03/11/2011 Treasurer's Report (3.11.11) (v: 1)   

easurer's Report (3.11.11).pdf   download>
Description: Treasurer's Report (3.11.11)
Type: Financial
Status: FINAL
Contact

 

03/09/2011 Draft Planning Agenda (3.17.11) (v: 1)   

aftPlanningAgenda(3-17-11).pdf   download>
Description: Planning Agenda (3.17.11)
Type: Agenda
Status: DRAFT

 

03/09/2011 Action Items 1.27.11 (v: 1)   

ActionItemsfrom1-27-11CGPM.pdf   download>
Description: Action Items 1.27.11
Type: Minutes
Status: DRAFT
Contact

 

03/07/2011 TCRM Tables (v: 1)   

request access >  login >
Description: TCRM Tables
Type: Spreadsheet
Status: DRAFT
Contact

 

03/01/2011 Examples of MOD 29 Impacts on APS (02-16-11 NERC Deep Dive Mtg) (v: 1)   

...-16-11 NERC Deep Dive Mtg).pdf   download>
Description: Examples of MOD 29 Impacts on APS (02-16-11 NERC Deep Dive Mtg)
Type: Report
Status: FINAL

 

03/01/2011 Joint Request for Extension regarding Electric Reliability Standard MOD-29-001 (v: 1)   

...bility Standard MOD-29-001.pdf   download>
Description: Joint Request for Extension regarding Electric Reliability Standard MOD-29-001
Type: Report
Status: FINAL

 

03/01/2011 MOD 029 Short Term Language Adjustments from NERC Deep Dive Mtg (v: 1)   

...ts from NERC Deep Dive Mtg.pdf   download>
Description: MOD 029 Short Term Language Adjustments from NERC Deep Dive Mtg
Type: Report
Status: FINAL

 

03/01/2011 Centralia Study Status 3.1.11 Final (v: 1)   

...aStudyStatus3-1-2011-Final.pdf   download>
Description: Centralia Study Status 3.1.11 Final
Type: Report
Status: DRAFT
Contact

 

02/28/2011 7.13.10 Approach to Standardize Intra-hour Business Practice Follow-up (v: 1)   

...rBusinessPracticesFollowup.pdf   download>
Description: 7.13.10 Approach to Standardize Intra-hour Business Practice Follow-up
Type: Document (pdf)
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Tacoma Power      Project: ColumbiaGrid     
Tacoma Power

"As a charter member of ColumbiaGrid, Tacoma Power has observed the benefits for its customers of regional transmission planning. Engaging in the ColumbiaGrid collaborative transmission planning process has fostered diverse and innovative solutions. This open process for identifying and resolving transmission challenges has delivered cost-effective reliability to our entire region."
~~ William A. Gaines, Director of Utilities