Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



2241 - 2260 out of 3541.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178  

05/05/2011 CG Planning Meeting 5.5.2011 Presentation (v: 1)   

CGPlgMtg5-5-11.pdf   download>
Type: Presentation
Status: DRAFT
Contact

 

05/05/2011 Updated PSAST Transmission Expansion Plan Results (presentation) (v: 1)   

...TTransExpPlanResults5-4-11.pdf   download>
Description: Updated PSAST Transmission Expansion Plan Results (presentation)
Type: Presentation
Status: DRAFT
Contact

 

05/04/2011 WECC New Transmission (v: 1)   

WECCNewTransmission.docx   download>
Description: WECC New Transmission
Type: Report
Status: DRAFT

 

05/04/2011 Table 1 CG 10 Year Plan (v: 1)   

Table1CG10YearPlan.xlsx   download>
Description: Table 1 CG 10 Year Plan
Type: Spreadsheet
Status: DRAFT
Contact

 

04/28/2011 BPA commented version (v: 1)   

...sure_Study_Draft__3_BPA-cg.doc   download>
Type:
Status: DRAFT

 

04/21/2011 EIM Update BOD (4.20.2011) (v: 1)   

EIMUpdateBOD042011.pdf   download>
Description: EIM Update BOD (4.20.2011)
Type: Presentation
Status: DRAFT
Contact

 

04/21/2011 PVsimulationsForCentraliaStudy.zip (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

04/20/2011 Board Minutes (02.16.11) (v: 1)   

BoardMinutes(021611).pdf   download>
Description: Board Minutes (02.16.11)
Type: Minutes
Status: FINAL
Contact

 

04/20/2011 Attendance List (4.20.2011) (v: 1)   

AttendanceList4.20.11.pdf   download>
Description: Attendance List (4.20.2011)
Type: Attendence Sheets
Status: DRAFT

 

04/19/2011 Transmission Planning Update (4.20.11) (v: 1)   

...TransmissionPlanningUpdate.pdf   download>
Description: 4-20-2011 Transmission Planning Update
Type: Presentation
Status: DRAFT
Contact

 

04/13/2011 Treasurer's Report - April 20, 2011 (v: 1)   

Treasurer's Report.pdf   download>
Description: Treasurer's Report - April 20, 2011
Type: Financial
Status: FINAL

 

04/14/2011 Updated Draft Report (v: 1)   

... CG GH PSE) and new graphs.doc   download>
Type: Report
Status: DRAFT
Contact

 

04/14/2011 Appendix-WOCN VoltageStabilityImpact (v: 1)   

request access >  login >
Type: Document (pdf)
Status: DRAFT
Contact

 

04/13/2011 Visio-DTC Stage 1 Draft Methodology (v: 1)   

...-DTCStage1DraftMethodology.pdf   download>
Description: Visio-DTC Stage 1 Draft Methodology
Type: Document (pdf)
Status: DRAFT

 

04/13/2011 DTC TF Meeting Notes 4.5.2011 (v: 1)   

TCTF-MtgNotes(05April2011).doc   download>
Description: DTC TF Meeting Notes 4.5.2011
Type: Minutes
Status: DRAFT

 

04/06/2011 Board Agenda (4.20.11) (v: 1)   

BoardAgenda(4.20.11).pdf   download>
Description: Board Agenda (4.20.11)
Type: Agenda
Status: FINAL
Contact

 

04/06/2011 BoardMeetingNotice(4.20.11) (v: 1)   

oardMeetingNotice(4.20.11).pdf   download>
Description: Board Meeting Notice(4.20.11)
Type: Notice
Status: FINAL
Contact

 

04/01/2011 MasterChangeFile.zip (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

03/31/2011 PSAST Sensitivity Results (v: 1)   

request access >  login >
Description: PSAST Sensitivity Results
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

04/29/2011 Centralia Closure Study Report FINAL (v: 3)   

...eStudyFinalReport4-28-2011.pdf   download>
Type: Report
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance