Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



2301 - 2320 out of 3752.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181   182   183   184   185   186   187   188  

11/09/2011 Multi-System Open Season Process (v: 1)   

Multi-SystemOpenSeason.pdf   download>
Type: Document (pdf)
Status: DRAFT

 

11/09/2011 MSOS Proposal (110911) (v: 1)   

MSOS_Proposal(110911).pdf   download>
Description: MSOS Proposal (110911)
Type:
Status: DRAFT

 

11/09/2011 Initial Thoughts on Business Case (111210) (v: 1)   

...oughtsBusinessCase(111210).pdf   download>
Description: Initial Thoughts on Business Case (111210)
Type: Document (pdf)
Status: DRAFT

 

11/08/2011 Treasurer's Report - November 4, 2011 (v: 1)   

TreasurersReport(110411).pdf   download>
Description: Treasurer's Report - November 4, 2011
Type: Financial
Status: FINAL

 

11/08/2011 BPA PV-Summary (v: 1)   

BPAPV-Summary.xls   download>
Description: BPA PV-Summary
Type: Spreadsheet
Status: DRAFT

 

11/08/2011 Draft Report - Cross Cascades Study Team (v: 1)   

DRAFTReport.doc   download>
Description: Draft Report - Cross Cascades Study Team
Type: Report
Status: DRAFT
Contact

 

11/08/2011 Project Metric Calculations (v: 1)   

ProjectMetricCalculations.xls   download>
Description: Project Metric Calculations
Type: Spreadsheet
Status: DRAFT
Contact

 

11/14/2011 ColumbiaGrid Transmission Plan 2012 Projects DRAFT (v: 2)   

...12TransmissionPlanDraft11.xlsx   download>
Description: ColumbiaGrid Transmission Plan 2012 Projects
Type: Spreadsheet
Status: DRAFT
Contact

 

11/08/2011 Action Items from 8.4.11 (v: 1)   

ActionItemsfrom8-4-11CGPM.pdf   download>
Description: Action Items from 8.4.11
Type: Minutes
Status: DRAFT
Contact

 

11/08/2011 CG Planning Meeting Slide (v: 1)   

CGPlgMtg11-10-11.pdf   download>
Description: CG Planning Meeting Slide
Type: Presentation
Status: DRAFT
Contact

 

11/08/2011 2012 ColumbiaGrid Planning Meetings 2012 (v: 1)   

...lumbiaGridPlanningMeetings.pdf   download>
Description: 2012 ColumbiaGrid Planning Meetings 2012
Type: Document (pdf)
Status: DRAFT
Contact

 

11/08/2011 Biennial Plan 2012 DRAFT (v: 1)   

...ialPlan2012-PlanningDRAFT.docx   download>
Description: Biennial Plan 2012 DRAFT
Type: Report
Status: DRAFT
Contact

 

11/07/2011 SAV format file solvable in PSLF 18 (v: 1)   

request access >  login >
Type: Base Case
Status: DRAFT
Contact

 

11/07/2011 Table 1 Ten Plan BP 2012 (v: 1)   

Table1TenYearPlan1.xlsx   download>
Description: Table 1 Ten Plan BP 2012
Type: Spreadsheet
Status: DRAFT
Contact

 

10/27/2011 Inductor Sizing TCRM Tables (v: 1)   

request access >  login >
Description: TCRM Tables for inductor sizing ATC runs.
Type: Spreadsheet
Status: DRAFT
Contact

 

10/25/2011 Member Meeting Minutes (10.19.11) (v: 1)   

MemberMtgminutes(10.19.11).pdf   download>
Description: Member Meeting Minutes (10.19.11)
Type:
Status: FINAL
Contact

 

10/21/2011 Path Variability Template (v: 1)   

confidentiality agreement required >
Description: Path Variability Template
Type: Spreadsheet
Status: DRAFT
Contact

 

10/20/2011 ATNI Links (v: 1)   

ATNI.Links.pdf   download>
Description: ATNI Links
Type: Document (pdf)
Status: DRAFT

 

10/19/2011 Attendance List (10.19.11) (v: 1)   

AttendanceList(10.19.11)1.pdf   download>
Description: Attendance List (10.19.11)
Type: Attendence Sheets
Status: FINAL
Contact

 

10/19/2011 Board Minutes (08.17.11) (v: 1)   

BoardMinutes(08.17.11).pdf   download>
Description: Board Minutes (08.17.11)
Type: Minutes
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance