Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



2381 - 2400 out of 3329.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167  

02/22/2010 NREL Wind Presentation (v: 1)   

Wind-NREL_presentation.pdf   download>
Description: NREL Wind Presentation
Type: Presentation
Status: DRAFT

 

02/22/2010 Draft Open Season Agenda (2.22.10) (v: 1)   

2.22.10ProposedAgenda.pdf   download>
Description: Proposed Agenda
Type: Agenda
Status: DRAFT
Contact

 

02/22/2010 Memo RE: Intertie Cost Allocation (v: 1)   

...reintertiecostalloc_npbPPC.doc   download>
Description: Memo RE: Intertie Cost Allocation
Type: Document (pdf)
Status: DRAFT

 

02/18/2009 Resolution to adopt 2009 Txn Exp Plan (02.18.09) (v: 1)   

...09 Txn Exp Plan (02.18.09).pdf   download>
Description: Resolution to adopt 2009 Transmission Expansion Plan (02.18.09)
Type: Corporate Doc
Status: FINAL
Contact

 

02/19/2010 Resolution for Adoption of Plan Update (020910) (v: 1)   

...AdoptionofPlanUpdate020910.doc   download>
Description: Resolution for Adoption of Plan Update (020910)
Type: Corporate Doc
Status: FINAL
Contact

 

02/17/2010 Attendance List (2.17.10) (v: 1)   

AttendanceSheet021710).pdf   download>
Description: Attendance List (2.17.10)
Type: Attendence Sheets
Status: FINAL
Contact

 

02/17/2010 TEPPC 2009 Study Program Results Report (v: 1)   

...udy-Program-Results-Report.pdf   download>
Description: TEPPC 2009 Study Program Results Report
Type: Report
Status: DRAFT

 

02/17/2010 ATNI TxE Update Winter 2010 (v: 1)   

TNI TxE Update Winter 2010.pdf   download>
Description: ATNI TxE Update Winter 2010
Type: Presentation
Status: FINAL

 

02/16/2010 PSA Transmisision Expansion Plan Dev. Status (02.17.10) (v: 1)   

SA Txn Exp Plan (02.17.10).pdf   download>
Description: Status of the Development of a Transmission Expansion Plan for the Puget Sound Area (02.17.10)
Type: Presentation
Status: FINAL
Contact

 

02/16/2010 2010 Update to 2009 Plan(02.17.10) (v: 1)   

...ate to 2009 Plan(02.17.10).pdf   download>
Description: 2010 Update to 2009 Plan(02.17.10)
Type: Presentation
Status: FINAL
Contact

 

02/12/2010 Dynamic Transfer Study (v: 1)   

Ppt0000005.pdf   download>
Description: Dynamic Transfer Study
Type: Presentation
Status: FINAL

 

02/16/2010 Treasurer's Report (02.17.10) (v: 1)   

TreasurersReport(2.17.10).pdf   download>
Description: Treasurer's Report (02.17.1
Type: Financial
Status: FINAL
Contact

 

02/12/2010 Audited Financial Statements - CY 2009 (v: 1)   

...dFinancialStatementsCY2009.pdf   download>
Description: Audited Financial Statements - CY 2009
Type: Financial
Status: FINAL
Contact

 

02/11/2010 WIST Agenda (2.18.10) (v: 1)   

WIST2-18-10DraftAgenda.pdf   download>
Description: WIST Agenda (2.18.10)
Type: Agenda
Status: DRAFT
Contact

 

02/10/2010 Powertech Summary of 2008 DS Lim Study (v: 1)   

...echsummaryof2008DSLimStudy.pdf   download>
Description: Powertech Summary of 2008 DS Lim Study
Type: Presentation
Status: DRAFT

 

02/09/2010 WIST Meeting Notes (12.17.09) (v: 1)   

WIST12-17-09Notes.pdf   download>
Description: WIST Meeting Notes (12.17.09)
Type: Minutes
Status: DRAFT

 

02/05/2010 Joint Initiative Think Tank Meeting Notice (v: 1)   

...nkTankMeetingNotice(final).pdf   download>
Description: Joint Initiative Think Tank Meeting Notice
Type: Notice
Status: DRAFT
Contact

 

02/03/2010 Puget Soung Area Expansion Plan (v: 1)   

...ansionPlan1-2010-Version3a.doc   download>
Type: Report
Status: DRAFT
Contact

 

02/03/2010 Board Agenda (02.17.10) (v: 1)   

BoardAgenda(02.17.10).pdf   download>
Description: Board Agenda (02.17.10)
Type: Agenda
Status: FINAL
Contact

 

02/03/2010 Board Notice (02.17.10) (v: 1)   

BoardNotice(02.17.10).pdf   download>
Description: Board Notice (02.17.10)
Type: Notice
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance