Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



3121 - 3140 out of 3541.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178  

09/30/2008 Forum Notice (10.07.08) (v: 1)   

ForumNotice(10.07.08).pdf   download>
Description: Forum Call Notice (10.07.08)
Type: Notice
Status: FINAL
Contact

 

09/30/2008 Board Notice (10.15.08) (v: 1)   

BoardNotice(10.15.08).pdf   download>
Description: Board Notice (10.15.08)
Type: Notice
Status: FINAL
Contact

 

09/29/2008 Hourly Transmission Service Flexibility Doc (9.29.09) (v: 1)   

...iceFlexibilityDoc(9.29.09).pdf   download>
Description: Hourly Transmission Service Flexibility Doc (9.29.09)
Type: Document (pdf)
Status: FINAL

 

09/29/2008 Hourly Transmission Service Flexibility Work Plan (9.29.08) (v: 1)   

...FlexibilityWkPlan(9.29.08).pdf   download>
Description: Hourly Transmission Servicve Flexibility Work Plan
Type: Spreadsheet
Status: DRAFT

 

09/29/2008 Intra-Hour Load Following/Balancing Work Plan (9.29.08) (v: 1)   

...BalancWkPlan (9.29.08).doc.pdf   download>
Description: Intra-Hour Load Following/Balancing Work Plan
Type: Spreadsheet
Status: FINAL

 

09/29/2008 Infrastructure Work Group Update2(9.29.08) (v: 1)   

...ucture WG Update2(9.29.03).pdf   download>
Description: Infrastructure Work Group Update
Type: Presentation
Status: FINAL

 

09/25/2008 Infrastructure Work Group Update (v: 1)   

InfrastructureWG Update.pdf   download>
Description: Infrastructure Work Group Update
Type: Presentation
Status: FINAL

 

09/24/2008 Board Minutes (8.20.08) (v: 1)   

BoardMinutes(08.20.08).pdf   download>
Description: Board Minutes (8.20.08)
Type: Minutes
Status: FINAL
Contact

 

08/21/2008 Board Minutes (07.22.08) (v: 1)   

BoardMinutes(07.22.08).pdf   download>
Description: Board Minutes (07.22.08)
Type: Minutes
Status: FINAL
Contact

 

09/18/2008 Northern Mid C Agenda (9-22-08) (v: 1)   

Agenda (9-22-08).pdf   download>
Description: Northern Mid C Agenda (9-22-08); Agenda (9-22-08)
Type: Agenda
Status: FINAL

 

09/17/2008 Attendence Sheet (09.17.08) (v: 1)   

AttendenceSheet(09.17.08).pdf   download>
Description: Attendence Sheet (09.17.08)
Type: Attendence Sheets
Status: FINAL
Contact

 

09/17/2008 Joint Initiative Report (09.17.08) (v: 1)   

JointInitiative(09.17.08).pdf   download>
Description: Joint Initiative Report (09.17.08)
Type: Report
Status: FINAL
Contact

 

09/16/2008 Report on Attachment K FERC Conference Call (09.17.08) (v: 1)   

AttachKConfCall(09.17.08).pdf   download>
Description: Report on Attachment K FERC Tech Conference Call (09.17.08)
Type: Report
Status: FINAL

 

09/16/2008 Attachment K Proposed Languange (9.17.08) (v: 1)   

AttKProposedLang.pdf   download>
Description: Attachment K Proposed Languange
Type: Report
Status: FINAL

 

09/16/2008 Biennial Planning 2009 Process & Schedule (09.17.08) (v: 1)   

Plan09Proc&Sched(09.17.08).pdf   download>
Description: Biennial Planning 2009 Process & Schedule (09.17.08)
Type: Report
Status: FINAL
Contact

 

09/16/2008 Planning Report (09.17.08) (v: 1)   

PlanningReport(09.17.08).pdf   download>
Description: Planning Report (09.17.08)
Type: Report
Status: FINAL
Contact

 

09/15/2008 Treasurer's Report (9.17.08) (v: 1)   

TreasurerReport(9.17.08).pdf   download>
Description: Treasurer's Report (9.17.08)
Type: Financial
Status: FINAL
Contact

 

09/15/2008 Board Agenda (09.17.08) (v: 1)   

BoardAgenda(09.17.08).pdf   download>
Description: Board Agenda (09.17.08).
Type: Agenda
Status: FINAL
Contact

 

09/15/2008 CG 2008 Transmission Plan Combined Changes (v: 1)   

...ion Plan(8 29 08)_combined.pdf   download>
Description: CG 2008 Transmission Plan with combined comments
Type: Spreadsheet
Status: DRAFT
Contact

 

12/17/2008 2009-2010_Budgets (v: final)   

2009-2010Budgets(12.17.08).pdf   download>
Description: 2009-2010_Budgets
Type: Financial
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance