Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



3201 - 3220 out of 3269.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164  

10/12/2007 Draft PSASG Update Report (v: 1)   

..._Update_Report_2007_Oct_11.pdf   download>
Description: Draft update to the 2004 Puget Sound Area Study Group Report: Assessment of Puget Sound Area/Northern Intertie Curtailment Risk
Type: Report
Status: FINAL
Contact

 

10/12/2007 Beverly Study July 2007 (v: 1)   

...dyJuly_2007_final_draft JM.pdf   download>
Description: Final draft of the Beverly Park project identified in the TPC Reliability Assessment of the NW Transmission System ("RANTS") report. This study reviews facility options to address future District load growth issues. One of the projects includes a 115-230kV transformer installation at the District Beverly Park switching station.
Type: Report
Status: FINAL

 

10/11/2007 PSAST Agenda (10.18.07) (v: 1)   

101807_Draft_Agenda_rev 3.doc   download>
Description: PSAST Agenda (10.18.07)7
Type: Agenda
Status: FINAL
Contact

 

10/09/2007 Summary of Benefits (v: 1)   

Summary of Benefits.pdf   download>
Description: Summary of Employment Benefits
Type: Policy/Procedure
Status: FINAL
Contact

 

10/05/2007 Draft Planning Agenda (10.09.07) (v: 1)   

... Plan Group Agenda 10-9-07.doc   download>
Description: Draft Planning Agenda (10.09.07)
Type: Agenda
Status: FINAL

 

11/14/2007 Regional Projects with Impacts on ColGrid Facilities (v: 3)   

...olumbiaGrid Facilities (3).pdf   download>
Description: This list and analysis was developed from information available to ColumbiaGrid as of Oct 2007
Type: Report
Status: FINAL
Contact

 

10/05/2007 System Assessment Proposal (v: 1)   

... Study Plan 9-26 edits v.1.doc   download>
Description: System Assessment Proposal
Type: Report
Status: DRAFT
Contact

 

10/05/2007 Report Outlines (v: 1)   

Report Outlines.doc   download>
Description: System Assessment Report Outline
Type: Report
Status: FINAL
Contact

 

10/01/2007 ADI-ACE Before & After (v: 1)   

... Before & After (10.01.07).xls   download>
Description: Hourly Average ACE before and Hourly Average ACE after ADI presented at Reliability Workshop
Type: Presentation
Status: FINAL
Contact

 

10/01/2007 Visibility - WSM (v: 1)   

isibility - WSM (10.01.07).ppt   download>
Description: Workshop Presentation on Visibility Overview, WSM Project, Status, Issues
Type: Presentation
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_Sep17-Sep24-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_Oct15-Oct22-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_Nov12-Nov19-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_May14-May21-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_Mar19-Mar26-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/02/2007 ADI_ACE_10secData_Jun18-Jun25-2006.xls (v: Equal Allocation V1)   

request access >  login >
Description: Equal Allocation V1
Type: Spreadsheet
Status: FINAL
Contact

 

10/01/2007 NWPP ADI Status (v: 1)   

ADIstatus (10 01 07).ppt   download>
Description: NWPP ADI Status Report for CG
Type: Presentation
Status: FINAL
Contact

 

10/01/2007 ReDispatch Pilot status (v: 1)   

...atchPilotstatus (10 01 07).ppt   download>
Description: Status Report for CG on ReDispatch Pilot Program staus
Type: Report
Status: FINAL
Contact

 

10/01/2007 Visibility - Scheduled Outage Coordination Report (v: 1)   

...bility Workshop (10.0.107).ppt   download>
Description: Scheduled Outage Coordination Report and Visibility
Type:
Status: FINAL
Contact

 

10/01/2007 BPA ReDispatch Pilot Project Draft Final Report (v: 1)   

...ReportDraftPost (10 01 07).doc   download>
Description: BPA ReDispatch Pilot Project Draft Final Report for CG
Type: Presentation
Status: FINAL
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance