Search Documents

Please note - this section requires that you ALLOW pop-ups and cookies. Please turn your pop-up blocker OFF, and ensure that your browser allows cookies.

 

SEARCH DOCUMENTS

Keyword:
Start Date:  
End Date:  
Type:
Working or Final:
Open For Comment:
Event:
Program:
Project:
Workgroup/Study Team:
Records Per Page
  Show All Versions for each Document



1961 - 1980 out of 3618.
More Results: 1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20  
21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  
41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  
61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  
81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  
101   102   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120  
121   122   123   124   125   126   127   128   129   130   131   132   133   134   135   136   137   138   139   140  
141   142   143   144   145   146   147   148   149   150   151   152   153   154   155   156   157   158   159   160  
161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180  
181  

05/31/2012 Draft Planning Agenda (6.7.12) (v: 1)   

raftPlanningAgenda(6-7-12).pdf   download>
Description: Draft Planning Agenda 6.7.12
Type: Agenda
Status: DRAFT

 

05/31/2012 Action Items from 5.3.12 (v: 1)   

ActionItemsfrom5-3-12CGPM.pdf   download>
Description: Action Items from 5.3.12
Type: Minutes
Status: DRAFT
Contact

 

05/31/2012 San Diego Blackout Presentation (v: 1)   

SanDiegoBlackout05072012.pdf   download>
Description: San Diego Blackout Presentation
Type: Presentation
Status: DRAFT

 

05/29/2012 13HSP1 Review Case Summary (v: 1)   

confidentiality agreement required >
Description: 13HSP1 Review Case Summary
Type: Spreadsheet
Status: DRAFT
Contact

 

05/22/2012 Treasurer's Report - April 30, 2012 (v: 1)   

TreasurersReport(04.30.12).pdf   download>
Description: Treasurer's Report - April 30, 2012
Type:
Status: FINAL

 

05/18/2012 2018HS2_DraftPrerunCase_rev2_PWB (v: 1)   

request access >  login >
Description: 2018HS2_DraftPrerunCase_rev2_PWB
Type: Base Case
Status: DRAFT
Contact

 

05/18/2012 2018HS2_DraftPrerunCase_rev2_EPC (v: 1)   

request access >  login >
Description: 2018HS2_DraftPrerunCase_rev2_EPC
Type: Base Case
Status: DRAFT
Contact

 

05/18/2012 18 HS2 Draft Prerun Rev2 Case Summary (v: 1)   

request access >  login >
Description: 18 HS2 Draft Prerun Rev2 Case Summary
Type: Spreadsheet
Status: DRAFT
Contact

 

05/18/2012 22lsp1s_ReviewCase_PWB (v: 1)   

request access >  login >
Description: 22lsp1s_ReviewCase_PWB
Type: Base Case
Status: DRAFT
Contact

 

05/18/2012 22lsp1s_ReviewCase_EPC (v: 1)   

request access >  login >
Description: 22lsp1s_ReviewCase_EPC
Type: Base Case
Status: DRAFT
Contact

 

05/18/2012 22LSP1-TEP Review Case Summary (v: 1)   

request access >  login >
Description: 22LSP1-TEP Review Case Summary
Type: Spreadsheet
Status: DRAFT
Contact

 

05/08/2012 North to South Study Summary Rev 1 (v: 1)   

request access >  login >
Description: North to South Study Summary Rev 1
Type: Document (pdf)
Status: DRAFT
Contact

 

05/08/2012 2018HS2 Draft Prerun Case PWB (v: 1)   

request access >  login >
Description: 2018HS2 Draft Prerun Case PWB
Type: Base Case
Status: DRAFT
Contact

 

05/08/2012 2018HS2 Draft Prerun Case EPC (v: 1)   

request access >  login >
Description: 2018HS2 Draft Prerun Case EPC
Type: Base Case
Status: DRAFT
Contact

 

05/09/2012 18 HS2 Draft Prerun Case Case Summary (v: 2)   

request access >  login >
Description: 18 HS2 Draft Prerun Case Case Summary
Type: Spreadsheet
Status: DRAFT
Contact

 

05/08/2012 18 HS2 Master Change Files (v: 1)   

request access >  login >
Description: Change files to the 18 HS2 reference case
Type: PowerWorld Auxiliary File
Status: DRAFT
Contact

 

05/08/2012 22LSP1-TEP Initial Submittal Files (v: 1)   

request access >  login >
Description: 22LSP1-TEP Initial Submittal Files
Type: Base Case
Status: DRAFT
Contact

 

05/04/2012 North to South Study Summary (v: 1)   

request access >  login >
Description: North to South Study Summary
Type: Document (pdf)
Status: DRAFT
Contact

 

05/03/2012 PRC 023 CG Meeting (Avista 5.3.12) (v: 1)   

PRC_023_CG Meeting.pdf   download>
Description: PRC 023 CG Meeting (Avista 5.3.12)
Type: Presentation
Status: DRAFT

 

05/03/2012 Transient Stability CG Planning Meeting (5.3.12) (v: 1)   

...lity_CG_PlanningMtg03May12.pdf   download>
Description: Transient Stability CG Planning Meeting (5.3.12)
Type: Presentation
Status: DRAFT
Contact

 


WHAT OUR MEMBERS SAY

Member: Chelan County PUD      Project: ColumbiaGrid     
Chelan County PUD

"Chelan PUD is a strong supporter of ColumbiaGrid and the work that’s accomplished through the transmission Planning and Expansion Functional Agreement (PEFA). As a result of that process, the mid-C utilities (Chelan, Grant and Douglas PUDs) and Bonneville Power Administration were able to reach an agreement that defined the need for a new transmission line, as well as determine who will construct, own and pay for the facility. Those difficult decisions were made successful through the expert and independent expertise of the ColumbiaGrid staff."
~~ Chad Bowman, Director - Transmission and Compliance